Pictures 1-29 were taken on February 2, 2017.
The 1st video was taken on April 7, 2020.
The 2nd video was taken on July 2, 2021.
Pictures 30-46 and the 3rd video were taken on February 26, 2022.
The 4th video was taken on March 1, 2022.
Pictures 47-64 and the 5th video were taken on May 28, 2022.
Picture 65 was taken on March 27, 2023.
Pictures 66-75 were taken on April 4, 2023.
The 6th video was taken on April 5, 2023.
Pictures 76-87 and the 7th video were taken on April 28, 2023.
Pictures 88-101 were taken on May 31, 2023.
Pictures 102-108 and the 8th video were taken on June 13, 2023.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Mendota Sub.
1
2
Overview of 2 older gated signals facing north.
Overview facing south.
3
4
5
6
7
8
9
10
11
12
13
The southern signal. This had a WRRS base, 12"x20" FS frames with Dialight Ball LEDs, 4" RECO LEDs, and a Western Cullen Hayes Inc. gate mechanism.
14
15
16
17
18
19
20
21
22
23
24
25
The northern signal. This had the same stuff but with two 12"x24" Safetran frames with Dialight Ball LEDs plus a GS Type 2 E-Bell.
In 2022, work began to replace the signals. By late February, the southern signal had been replaced.
30
31
Overview of the mixed setup facing north.
Overview facing south.
32
33
34
35
36
37
38
39
40
41
42
The new southern signal. BNSF decided to transfer the old sidelights over from the previous signal. Very strange seeing FS light frames on a modern Siemens signal.
43
44
45
46
The old northern signal. The rear lights' backgrounds were looking ragged at this point. You can see new counterweights next to it for the new northern signal that would soon be installed.
Just a few days later around March 3, the new northern signal was installed. With both signals, they were mounted on the existing foundations.
47
48
Overview of the finished new signals facing north.
Overview facing south.
49
50
51
52
53
54
55
56
57
58
59
60
The new northern signal. Similar to the other signal, the FS sidelights were carried over. I'm surprised the newer Safetran lights weren't carried over. The GS Type 2 from the prior signal was carried over too.
61
62
63
64
The same relay bungalow in the southwest quadrant.
In early 2023, work was starting to further modernize this crossing.
65
On March 27th, I spotted a new bungalow for this crossing in town, along with one for CR 450 E.
66
67
68
69
70
71
72
73
74
75
On April 4th, we see the new bungalow was installed behind the current one. I wasn't sure at this point if the current signals would be carried over or if even newer signals would be used, as the latter wouldn't really surprise me too much given other crossings I've seen. One the visors on the southern signal's lights was missing too at this point.
76
77
78
79
80
81
82
83
84
85
86
87
By April 28th, new foundations were installed, and I was very confident that BNSF would be installing even newer signals at this point. However, this would not be the case.
88
89
90
91
92
93
94
95
96
97
On May 31st, we see the existing signals were moved onto the new foundations. At the same time, a GS Type 3 was added to the southern signal and the missing visor was fixed.
98
99
100
101
The old bungalow was removed at this point, but the mounting brackets for it were still in place.
102
103
104
105
106
107
108
On June 13th, we see the old mounting brackets were removed and the new foundations were graveled in, thus finishing the new setup.