MP: 25.76


Created March 2021

Total Accidents:  1
Crossing DOT #:  478779F
TOTAL DAILY TRAINS:  32  (AS OF 2019)

>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: WCH Mechanical Bell 2nd Gen WCH Mechanical Bell 2nd Gen
Cantilever: TCR Cantilever TCR Cantilever
Mast Base: Siemens 5" Single Sided ^ Siemens 5" Single Sided ^
LED Types: 6 - 12"x24" Safetran w/ GE Uniform Look LEDs
2 - 12"x24" Safetran w/ Dialight Low Wattage LEDs
6 - 12"x24" Safetran w/ GE Uniform Look LEDs
2 - 12"x24" Hawker Safetran w/ GE Uniform Look LEDs
Junction Boxes: 1 Safetran, 1 Fabricated Metals, 1 WCH 1 Safetran, 2 WCH
Gate Lights: 3 - 4" RECO 3 - 4" RECO
Gate Mechanism: Siemens Sticker Style 2 w/ Standard Mount Siemens Sticker Style 2 w/ Standard Mount
Gate Striping: Vertical Striping Vertical Striping


>>>>>>>>>>>>>> Northwestern Pedestrian Gate Northeastern Pedestrian Gate Southwestern Pedestrian Gate Southeastern Pedestrian Gate
Base: Siemens 5" Double Sided ^ Siemens 5" Double Sided ^ Siemens 5" Double Sided ^ Siemens 5" Double Sided ^
Gate Light: 4" RECO 4" RECO 4" RECO 4" RECO
Gate Mechanism: Siemens Sticker Style 2 Siemens Sticker Style 2 Siemens Sticker Style 2 Siemens Sticker Style 2
Gate Striping: Vertical Striping Vertical Striping Vertical Striping Vertical Striping

Picture 1 was taken on April 2, 2019.
Pictures 2-51 were taken on May 20, 2020.
All pictures were taken by Tommy McGowan.
This crossing is located on the Metra Southwest Service.

G1 G2
Google Streetview images from 2012 showing two older gate signals with Harmon Fading LEDs, Safetran gate mechanisms, and WCH Mechanical Bells.
G3 G4
By 2015, major changes were starting to happen. The road was about to undergo a widening project. By this point, new foundations were in place for all new signals.
1 G5
By 2019, the old 2 lane road had been removed, and the new eastbound lanes were constructed by this point, temporarily being used as a 2 way road. The prior eastern signal was moved over temporarily, and the new permanent western cantilever was installed. By 2020, the work was completed, and a new cantilever was installed on the east side, along with 4 pedestrian gates.
2 3
Overview of the finished setup facing east. Overview facing west.
4 5 6
7 8 9
10 11 12 13
14 15 16 17
The western signal.
18 19 20
21 22 23
24 25 26 27
28 29 30 31
The eastern signal.
32 33 34 35
The northwestern pedestrian gate.
36 37 38 39
The northeastern pedestrian gate.
40 41 42 43
The southwestern pedestrian gate.
44 45 46 47
The southeastern pedestrian gate.
48 49 50 51
The relay bungalow in the southwest quadrant. The grade is concrete and rubber. Track view facing north towards 153rd St. Track view facing south towards 108th Ave.