Pictures 1-20 were taken on June 4, 2019.
The video was taken on September 15, 2023.
Pictures 21-48 were taken on September 16, 2023.
All pictures and video were taken by Tommy McGowan.
This crossing is located on the UP Villa Grove Sub.
1
2
Overview of 2 gateless signals facing east.
Overview facing west.
3
4
5
6
7
8
9
The western signal. This had a MI base and 12"x20" MI frames with Electro-Tech's LEDs.
10
11
12
13
14
15
16
The eastern signal. This had a MI base, 12"x20" Safetran frames with Electro-Tech's LEDs, and a WCH E-Bell.