| >>>>>>>>>>>>>> |
Western Signal |
Eastern Signal |
| Bell: |
WCH Mechanical Bell 2nd Gen |
WCH Mechanical Bell 2nd Gen |
| Cantilever: |
MI Cantilever |
MI Cantilever |
| Mast Base: |
Siemens 5" Single Sided ^ |
Siemens 5" Single Sided ^ |
| Lights: |
7 - 12"x24" Safetran w/ Harmon Fading LEDs
1 - 12"x24" WCH w/ Harmon Fading LED |
9 - 12"x24" Safetran w/ Harmon Fading LEDs
1 - 12"x24" Hawker Safetran w/ Harmon Fading LED |
| Junction Boxes: |
2 MI, 1 Safetran |
2 MI, 2 Safetran |
| Gate Lights: |
4" RECO LEDs |
4" RECO LEDs |
| Gate Mechanism: |
Siemens Sticker Style 2 w/ Standard Mount |
Siemens Sticker Style 2 w/ Standard Mount |
| Gate Striping: |
Vertical Striping |
Diagonal Striping |
| >>>>>>>>>>>> |
Western Pedestrian Gate |
Eastern Pedestrian Gate |
| Base: |
Siemens 5" Double Sided ^ |
Siemens 5" Double Sided ^ |
| Gate Light: |
4" RECO LED |
4" RECO LED |
| Gate Mechanism: |
Siemens Sticker Style 2 |
Refurbished Safetran 2000s |
| Gate Striping: |
Diagonal Striping |
Diagonal Striping |
All pictures were taken on November 2, 2019, by Tommy McGowan.
The video was taken on May 18, 2020, by Tommy McGowan.
This crossing is located on the Metra Rock Island District.