52.54


290500V

>>>>>>>>>>>>>>> Northern Entrance Signal Northern Exit Signal Southern Entrance Signal Southern Exit Signal
Bell: WCH Type 2 E-Bell GS Type 3 E-Bell NEG E-Bell GS Type 3 E-Bell
Base: Siemens 5" Double Sided ^ Siemens 5" Double Sided ^ Siemens 5" Double Sided ^ Siemens 5" Double Sided ^
Lights: 3 - 12"x24" Safetran w/ GE Dotted LEDs
1 - 12"x24" Safetran w/ 2nd Gen WCH LED
4 - 12"x24" Safetran w/ GE Dotted LEDs 4 - 12"x24" Safetran w/ GE Dotted LEDs 4 - 12"x24" Hawker Safetran w/
Electro-Tech's LEDS
Junction Box: Safetran 1 WCH, 1 Safetran Safetran WRRS
Gate Lights: NEG Clear LEDs NEG Clear LEDs NEG Clear LEDs NEG Clear LEDs
Gate Mechanism: WCH Style 4 w/ WCH Gate Saver Siemens Sticker Style 1 w/ Standard Mount WCH Style 4 w/ WCH Gate Saver Refurbed Safetran 2000s w/ Standard Mount
Gate Striping: Vertical Striping Vertical Striping Vertical Striping Vertical Striping


>>>>>>>>>>>> Northern Pedestrian Gate Southern Pedestrian Gate
Base: Siemens 5" Single Sided ^ Siemens 5" Single Sided ^
Gate Light: 4" RECO LED 4" RECO LED
Gate Mechanism: Siemens Sticker Style 2 Siemens Imprinted
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-20 were taken on December 18, 2010.
Pictures 21-44 were taken on March 14, 2015.
Pictures 45-54 were taken on February 7, 2017.
Pictures 55-59 were taken on January 31, 2018.
Pictures 60-62 were taken on April 4, 2018.
Pictures 63-92 were taken on November 12, 2018.
Pictures 93-96 were taken on December 25, 2018.
The 1st video was taken on March 15, 2015.
The 2nd video was taken on November 22, 2017.
The 3rd video was taken on November 14, 2018.
The 4th video was taken on February 17, 2019.
The 5th video was taken on April 8, 2019.
The 6th video was taken on October 21, 2020.
The 7th video was taken on September 6, 2022.
Picture 97 was taken on December 19, 2021.
Pictures 98-134 were taken on April 25, 2023.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Joliet Sub.

1
2
Overview of 2 nice gated signals facing north.
Overview facing south.
3 4
5
6
7
8
The southern signal.
9 10 11
12
13
14 15
16
The northern signal.
17 18
19
20
The grade at the time was wood and asphalt.
Track view facing south towards 1st St.
Track view facing north towards Kankakee River Dr.
The relay case in the northeast quadrant.

The depot seen in a few photos was torn down in early 2012.
The grade was resurfaced in 2011 when new wood ties were installed, but was resurfaced again in 2012 when all wooden ties were replaced with concrete ones!
The only other change was the addition of blue DOT signs.

21
22
Overview facing south.
Overview facing north.
23 24 25
26 27 28
29 30 31
The northern signal.
32 33 34
35 36 37
38 39
40
The southern signal.
41 42 43 44
The relay case in the northeast quadrant. The newer all concrete grade.
Track view facing south towards 1st St.
Track view facing north towards Kankakee River Dr.

In mid 2016, the GRS/WRRS gate mechanism was replaced with a WCH mechanism, both gates were replaced, and both crossbucks were replaced.

45
46
Overview facing south.
Overview looking north.
47 48
49
The updated northern signal.
50
51
The updated southern signal.
52 53
54
New wiring is going in all around the crossing.

By early 2018, a new relay bungalow was installed behind the current relay case.  The signals remain unchanged.
I also included a couple shots showing the work going on to put a 2nd track through here.

55 56
57
Updated views with the new relay bungalow.
58
59
Track view facing north towards Kankakee River Dr.  Note the closed private crossing.
Track view facing south towards 1st St.  A new bridge is being constructed over the Kankakee River.
60 61
62
By April 2018, the crossing was closed to allow resurfacing and replacing of the signals to make way for the double track.  I also included a couple shots of the closed private crossing just north of Kankakee St.

The new signals were installed by May 2018 and the old relay case was removed.
The new main track was completed around the same time, and by June 2018, the old track was removed and the old bridge in Picture 44 was removed.
By November 2018, a new bridge was being constructed for the new northern track, and new exit signals and pedestrian gates were off to the side waiting for installation.  The crossing was closed again when I was here, but was set to reopen soon.

63
64
Overview of the new setup facing north.
Overview facing south.
65 66
67
68 69
70
71 72 73 74
The new northern signal.
75 76
77
78 79
80
81 82 83 84
The new northern signal.
85 86 87 88
The relay bungalow in the northeast quadrant.The newer 2 track concrete grade.
Track view facing north towards Kankakee River Dr. Track view facing south towards 1st St.
89 90 91 92
New signals off to the side waiting to be installed.  The bases have been installed for the northern exit signal and pedestrain gate, but the signals haven't been placed on them yet.
93 94 95 96
Updated shots from Christmas Day 2018.  Not much has changed other than new fencing around the crossing.
97
In December 2021, I saw some signs that work may finally be progressing, and indeed by Summer 2022, the new exit signals and pedestrian gates were FINALLY installed.
98
99
Overview of the completed final setup facing north. Overview facing south.
100 101
102
103 104
105
The DOT tags on the entrance signals were turned forward, but other than that, they remain unchanged.
106 107
108
109 110
111
112 113
114
The new southern exit signal. Pay close attention to the gate mechanisms on the new signals as I go through them.
115 116
117
118 119
120
121 122
123
The northern exit signal.
124 125 126 127
The southern pedestrian gate.
128 129 130 131
The northern pedestrian gate. If you noticed, all 4 new signals have different style of Safetran/Siemens gate mechanisms! Pretty neat to see all of them at one crossing.
132 133 134
The relay bungalow in the northeast quadrant. Track view facing north towards Kankakee River Dr. Track view facing south towards 1st St.

As of early 2024, no work has yet continued on the double tracking of this line.