Pictures 1-17 were taken on December 18, 2010.
Picture 18 were taken on September 4, 2010.
Pictures 19-44 and the 1st video were taken on March 14, 2015.
Pictures 45-50 were taken on February 7, 2017.
The 2nd video was taken on November 22, 2017.
Pictures 51-54 were taken on February 5, 2018.
Pictures 55-59 were taken on April 4, 2018.
Pictures 60-99 were taken on November 12, 2018.
The 3rd video was taken on November 14, 2018.
The 4th video was taken on April 4, 2019.
The 5th video was taken on April 14, 2019.
The 6th video was taken on May 9, 2020.
Pictures 100-109 and the 7th video were taken on April 25, 2023.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Joliet Sub.
1
2
Overview of 2 gateless signals facing east.
Overview facing west.
3
4
5
6
7
The western signal. This had a WRRS mechanical bell at the time.
Action shot from September 2010. Click here to see a video of the train
By early 2012, the WRRS bell was replaced with a WCH Type 4 and track signs were added.
By 2014, gates were added to the existing signals! This might be
the only time I've ever seen this done in person. They now have
used WCH gate mechanisms and most likely used gates and new gate
holders. Also a WCH Type 4 was added to the eastern signal. A new relay bungalow was also installed.
19
20
Overview of the updated crossing facing east.
Overview facing west.
21
22
23
24
25
26
27
28
29
The western signal.
30
31
32
33
34
35
36
37
38
The eastern signal.
39
40
41
The old relay case and new relay bungalow in the northwest quadrant.
By late 2015, the old relay case was removed.
In early 2017, work was underway to double track this portion of the
line. The old siding seen in Picture 42 was taken out and a
roadbed has been cleared out.
45
46
Overview facing east.
Overview facing west.
47
48
49
50
Photos of wires going in around the crossing.
51
52
53
54
In February 2018, we
see a new relay bungalow at the crossing waiting to be installed, set
to replace the other bungalow that was installed no earlier than 2013.
55
56
57
58
59
By April 2018, work
was ramping up for the upgrade of the crossing. New concrete pads
were waiting off to the side to be installed.
By July 2018, the road was widened, the tracks had been upgraded, new
exit signals were installed, the old relay bungalow was removed, and a
new track was installed to be used for the future double track
expansion. Oddly enough though, even after all the upgrades, the
old signals were reused. So to put in this into perspective, the
old gateless signals had gates retrofitted onto them, and then those
same signals were reused for the quad gating of this crossing!
Name me one other crossing where something like that was done.
And considering UP has replaced newer mid 2000s WCH signals completely
before, including at the next crossing to the north, this has me
completely baffled, especially since UP has been getting rid of most of
the Electro-Tech's LEDs along this line. Whatever the case, they
were reused, but had their crossbucks and gates replaced. The
western signal also had its track sign replaced.
60
61
Overview facing east.
Overview facing west.
62
63
64
65
66
67
The updated western entrance signal.
68
69
70
71
72
73
The updated eastern entrance signal.
74
75
76
77
78
79
80
81
82
The new western exit signal.
83
84
85
86
87
88
89
90
91
The new eastern exit signal.
92
93
94
95
The new relay bungalow, plus the updated concrete grades and the upgraded siding track.
96
97
98
99
More views of the
new track layout, including the future double track. I have no
idea when that will be completed, but I imagine it's going to be a long
time.
100
101
102
103
104
105
106
107
In April 2023, we see the DOT tags on the entrance signals were turned to face forward.