Pictures 1-28 were taken on February 2, 2017.
The 1st video was taken on December 27, 2019.
Pictures 29-38 and the 2nd video were taken on March 29, 2023.
Picture 39 and the 3rd video were taken on April 5, 2023.
Pictures 40-70 and the 4th video were taken on May 8, 2023.
Pictures 71-76 were taken on May 22, 2023.
Pictures 77-85 were taken on February 20, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Mendota Sub.
These signals were installed in the early 1990s by BN replacing WRRS signals.
1
2
Overview of 2 gated signals facing west.
Overview facing east.
3
4
5
6
7
8
9
10
11
The eastern signal. This had a mix of 12"x20" and 12"x24" Safetran frames with Dialight Ball LEDs, a WCH base, and a WCH Style 3 gate mechanism.
12
13
14
15
16
17
18
19
20
21
22
23
24
The western signal. This had four 12"x24" Safetran frames and two 12"x20" FS frames with Dialight Ball LEDs, a WCH base, and a WCH Style 3 gate mechanism. This also appeared to be an older GS E-Bell at the time, which was later replaced by a Type 3.
25
26
27
28
The relay bungalow in the southeast quadrant
The grade is all concrete.
Track view facing west towards East St. in Malden.
The old relay bungalow was still in at this point.
71
72
73
74
75
76
By May 22nd, the foundations were graveled in and the old bungalow was removed, finishing the process.
77
78
79
80
81
82
83
84
85
In February 2024, we see the standard gate mounts were replaced with GSI gate savers. Not sure why this wasn't done when the signals were first installed. Also, the grade was resurfaced.