309.87


431078J

>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: NEG E-Bell NEG E-Bell
Cantilever: Lindsay Rail Cantilever Lindsay Rail Cantilever
Mast Base: Siemens 5" Single Sided > Siemens 5" Single Sided >
Lights: 6 - 12"x24" WCH w/ GE Dotted LEDs
2 - 12"x24" Safetran w/ GE Dotted LEDs
6 - 12"x24" WCH w/ GE Dotted LEDs
2 - 12"x24" Safetran w/ GE Dotted LEDs
Junction Box: 2 Progress Rail, 1 Safetran 2 Progress Rail, 1 Safetran
Gate Lights: NEG Clear LEDs NEG Clear LEDs
Gate Mechanism: Refurbished Safetran 2000s w/ Old NEG 2 Way Saver Refurbished Safetran 2000s w/ Old NEG 2 Way Saver
Gate Striping: Vertical Striping Vertical Striping

All pictures were taken on September 28, 2023, by Tommy McGowan.
This crossing is located on the UP Mt. Vernon Sub.

G1 G2 G3
Google Streetview images from February 2016 showing two gateless cantilevers with 12"x20" LEDs, one with a WCH E-Bell, the other a GS E-Bell. In 2017, these were replaced with brand new gated cantilevers.
1 2
Overview of the newer signals facing east. Overview facing west.
3 4 5
6 7 8
9 10 11 12
13 14 15 16
The western signal.
17 18 19
20 21 22 23
24 25 26 27
28 29 30 31
The eastern signal.
32 33 34 35
The relay bungalow in the northeast quadrant. The grade is all concrete. Track view facing east towards IL 148. Track view facing west towards River Rd. in Royalton.
36
This wayside signal was installed around the same time as the crossing signals.