| >>>>>>>>>>>>>> |
Northern Signal |
Southern Signal |
| Bell: |
WCH Type 2 E Bell |
WCH Type 2 E Bell |
| Base: |
WCH 5" Double Sided ^ |
WCH 5" Double Sided ^ |
| Lights: |
4 - 12"x24" WCH w/ GE Pixelated Look LEDs |
4 - 12"x24" WCH w/ GE Pixelated Look LEDs |
| Junction Box: |
WCH |
WCH |
| Gate Lights: |
4" RECO |
4" RECO |
| Gate Mechanism: |
WCH Style 4 w/ GSI Gate Saver |
WCH Style 4 w/ GSI Gate Saver |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
| >>>>>>>>>>>> |
Northern Pedestrian Gate |
Southern Pedestrian Gate |
| Bell: |
Bell Speaker |
None |
| Base: |
WCH 5" Double Sided ^ |
WCH 5" Double Sided ^ |
| Gate Light: |
4" RECO |
4" RECO |
| Gate Mechanism: |
WCH Style 4 |
WCH Style 4 |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
Pictures 1-21 were taken on February 2, 2019.
The video was taken in October 2021 by Kyle B Videography.
Pictures 22-63 were taken on February 24, 2024.
All pictures were taken by Tommy McGowan.
This crossing is located on the South Shore Mainline.
In 2022, work had begun on double tracking the line through here. By 2023, the 2nd track was installed and 2 new pedestrian gates were installed. Initially, the existing signals were moved onto new foundations and were used alongside the new pedestrian gates. However, by late 2023, the road signals were replaced with brand new WCH signals.