Northern Signal |
Southern Signal |
| Bell: |
GS Type 2 E Bell |
GS Type 2 E Bell |
| Base: |
L&W 5" Single Sided ^ |
L&W 5" Single Sided ^ |
| Lights: |
4 - 12"x20" Safetran w/ Safetran Fading LEDs |
4 - 12"x20" Safetran w/ Safetran Fading LEDs |
| Junction Box: |
L&W |
L&W |
| Gate Lights: |
4" RECO |
4" RECO |
| Gate Mechanism: |
WCH Style 4 w/ GSI Gate Saver |
WCH Style 4 w/ GSI Gate Saver |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
| >>>>>>>>>>>> |
Northern Pedestrian Gate |
Southern Pedestrian Gate |
| Bell: |
Bell Speaker |
Bell Speaker |
| Base: |
WCH 5" Double Sided ^ |
WCH 5" Double Sided ^ |
| Gate Light: |
4" RECO |
4" RECO |
| Gate Mechanism: |
WCH Style 4 |
WCH Style 4 |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
All pictures were taken on February 24, 2024, by Tommy McGowan.
The video was taken in October 2021 by Kyle B Videography.
This crossing is located on the South Shore Mainline.
In 2022, work began here to double track the mainline. The signals were moved onto new foundations, two new pedestrian gates and a new bike path were installed, and a new bungalow was installed. New gates and 2 tracks signs were installed on the main signals.