>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: GS E Bell GS E Bell
Base: Siemens 5" Double Sided <> Siemens 5" Double Sided <>
Lights: 4 - 12"x20" Safetran w/ GE Uniform Look LEDs 4 - 12"x20" Safetran w/ GE Uniform Look LEDs
Junction Box: Safetran Safetran
Gate Lights: 4" RECO 4" RECO
Gate Mechanism: Siemens Imprinted w/ NEG 1 Way Saver Siemens Imprinted w/ NEG 1 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-29 were taken on March 2, 2021.
Pictures 30-59 were taken on April 24, 2024.
All pictures were taken by Tommy McGowan.
This crossing is on the IHB Danville Branch, which connects the NS Kankakee Line to the IHB's Gibson Yard.

1 2
Overview of 2 endangered gated signals facing west. Overview facing east.
3 4 5
6 7 8
9 10 11
The eastern signal. This had a Safetran base, 12"x24" Safetran incandscents, 4" RECO gate lights, and a Safetran 1990s gate mechanism.
12 13 14
15 16 17
18 19 20
The western signal. This had a Safetran base, 12"x24" Hawker Safetran incandscents, 4" RECO gate lights, and a Safetran 2000s gate mechanism.
21 22 23 24
The relay bungalow in the northwest quadrant. The grade is rubber and asphalt. Track view facing north towards 165th St. #1. Track view facing south towards 173rd St. #1.
25 26
27 28 29
As you can see, IHB was in the process of replacing these signals. A new bungalow was installed and new foundations were installed or about to be installed. By 2022, the new signals were put in and activated.
30 31
Overview of the new signals facing west. Overview facing east.
32 33 34 35
36 37 38 39
40 41 42 43
The new eastern signal.
44 45 46 47
48 49 50 51
52 53 54 55
The new western signal.
56 57 58 59
The new relay bungalow in the northwest quadrant. The grade is rubber and asphalt. Track view facing north towards 165th St. #1. Track view facing south towards 173rd St. #1.

.