| >>>>>>>>>>>>>> |
Northern Signal |
Southern Signal |
| Bell: |
WCH Mechanical Bell 2nd Gen |
None |
| Base: |
WRRS 5" Single Sided ^ |
WRRS 5" Single Sided ^ |
| Lights: |
3 - 12"x20" Safetran w/ Safetran Fading LEDs
1 - 12"x20" Hawker Safetran w/ Safetran Fading LED |
4 - 12"x20" Safetran w/ Safetran Fading LEDs |
| Junction Box: |
WRRS |
WRRS |
| Gate Lights: |
4" RECO LEDs |
4" RECO LEDs |
| Gate Mechanism: |
WCH Style 4 w/ older counterweights & GSI Gate Saver |
WCH Style 4 w/ older counterweights & GSI Gate Saver |
| Gate Saver: |
GSI Gate Saver |
GSI Gate Saver |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
Pictures 1-29 were taken on January 2, 2016.
The 1st video was taken on March 7, 2020.
The 2nd video was taken in July 2021 by Kyle B Videography.
Pictures 30-34 were taken on April 24, 2024.
Picture 35 and the 3rd video were taken on August 10, 2024.
The 4th video was taken on October 14, 2024, by Kyle B Videography.
All pictures and videos were taken by Tommy McGowan unless noted.
This crossing is located on the South Shore Mainline.
In 2021, the road was rehabilitated and new sidewalks were constructed around the crossing. The road signals were relocated slightly, and the pedestrian gate was surprisingly removed.
In 2023, work began on building a new station for Hammond just west of here. When finished, the mainline will be moved to the south slightly. By 2024, work on the new crossing had begun.