>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: WCH Mechanical Bell 2nd Gen None
Base: WRRS 5" Single Sided ^ WRRS 5" Single Sided ^
Lights: 3 - 12"x20" Safetran w/ Safetran Fading LEDs
1 - 12"x20" Hawker Safetran w/ Safetran Fading LED
4 - 12"x20" Safetran w/ Safetran Fading LEDs
Junction Box: WRRS WRRS
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: WCH Style 4 w/ older counterweights & GSI Gate Saver WCH Style 4 w/ older counterweights & GSI Gate Saver
Gate Saver: GSI Gate Saver GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-29 were taken on January 2, 2016.
The 1st video was taken on March 7, 2020.
The 2nd video was taken in July 2021 by Kyle B Videography.
Pictures 30-34 were taken on April 24, 2024.
Picture 35 and the 3rd video were taken on August 10, 2024.
The 4th video was taken on October 14, 2024, by Kyle B Videography.
All pictures and videos were taken by Tommy McGowan unless noted.
This crossing is located on the South Shore Mainline.

1 2
Overview of 2 gated signals and a pedestrian gate facing north. Overview facing south.
3 4 5
6 7 8
9 10 11
The southern signal.
12 13 14
15 16 17
18 19 20 21
The northern signal.
22 23 24 25
The northern pedestrian gate. This had a WRRS base and a WCH Style 4 gate mechanism with an older counterweight.
26 27 28 29
The relay cases in the northwest quadrant. The grade is rubber and asphalt. Track view facing west at Brunswick St. & Wabash Ave. Track view facing east at Alley Crossing.

In 2021, the road was rehabilitated and new sidewalks were constructed around the crossing. The road signals were relocated slightly, and the pedestrian gate was surprisingly removed.
In 2023, work began on building a new station for Hammond just west of here. When finished, the mainline will be moved to the south slightly. By 2024, work on the new crossing had begun.

30 31 32 33 34
By April 2024, 3 of the new signals were installed. Thankfully pedestrian gates will be returning here again.
35
As of August 2024, not much had changed.