MP:  118.12

 

Created December 2025

 

Total Accidents:   2
Crossing DOT #:  879048H
TOTAL WEEKLY TRAINS:   2   (AS OF 2025)

 

>>>>>>>>>>>>> Northern Main Signal Southern Main Signal
Northern Median Signal
Southern Median Signal
Bell: Safetran Type 3 E-Bell (Low Tone)
N/A
N/A
N/A
Base: N/A
N/A Safetran 5" Double Sided
Safetran 5" Single Sided
Cantilever:
Safetran
Safetran
N/A N/A
Light Frames: 10 - 12"x20" Safetran incandescents
12 - 12"x20" Safetran incandescents 2 - 12"x20" Safetran incandescents 2 - 12"x20" Safetran incandescents
Light Brackets:
3 - Safetran
4 - Safetran
Safetran
Safetran
Gate Lights: 3 - NEG 4" incandescents
3 - NEG 4" incandescents 2 - NEG 4" incandescents
1 - RECO 4" incandescent
3 - NEG 4" incandescents
Gate Mechanism: Safetran 2000s w/ NEG 1 Way Saver
Safetran 2000s w/ NEG 1 Way Saver Safetran 2000s w/ NEG 1 Way Saver Siemens Imprinted w/ NEG 1 Way Saver
Gate Striping: Diagonal Striping
Vertical Striping
Diagonal Striping Vertical Striping

 

Page created by: tomasthetrain3

 Pictures 1-58 and the video were taken on September 8, 2025, by Nicholas Miles/Northwestern Ohio Rail Productions.

This crossing is located on a spur coming off of the NS New Castle District and goes west to serve 2 factories west of here.


IN1

IN2

IN3

IN4

INDOT pictures from 2002 shows an older gateless mast and cantilever setup with 8 inch lights and no bells. The cantilever signals strangely lacked mast lights. By 2007 or 2008, this setup was completely replaced with a new gated setup.

1

2

Overview of 2 gated cantilever signals and 2 gated signals (with something off) facing south.
Overview facing north.

3

4

5

6

7

8

9

10

11

12

13

14

15

16

The northern main signal.

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

The southern main signal. This is what's off here. The gate mechanism was opened up! I'm not sure if someone forgot to close it or lock it and the cover just fell open one day, but hey, you get a picture of what's inside of a Safetran gate mechanism lol.

34

35

36

37

38

39

40

41

The northern median signal.

42

43

44

45

46

47

48

49

50

The southern median signal.

51

52

53

54

The relay bungalow.
This crossing's grade is made of steel.
Track view facing east towards 23rd Street on the New Castle District.
Track view facing west towards the factories.

55

56

57

58

Additional images of the "1 Track" signs on all 4 signals at this crossing.

It may be hard to tell, but if you look at some pictures, you can see the Progress Rail Services building in the background. This is one of their main spots for building new locomotives or rebuilding locomotives, the other location being in Mayfield, Kentucky.