>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS E Bell None
Cantilever: Lincoln Industries Cantilever Lincoln Industries Cantilever
Mast Base: Safetran 5" Double Sided ^ Safetran 5" Double Sided ^
Lights: 10 - 12"x24" Safetran incandescents 10 - 12"x24" Safetran incandescents
Junction Boxes: 2 Safetran, 1 Progress Rail 2 Safetran, 1 Progress Rail
Gate Lights: 4" NEG LEDs 4" NEG LEDs
Gate Mechanism: Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver
Gate Striping: Vertical Striping Diagonal Striping

All pictures were taken on March 26, 2021, by Tommy McGowan.
This crossing is located on the CF&E Ft. Wayne Sub.

1
2
Overview of 2 gated cantilevers facing north. Overview facing south.
3 4 5
6 7 8 9
10 11 12 13
14 15 16 17
The southern signal.
18 19 20 21
22 23 24 25
26 27 28 29
30 31 32 33
The northern signal.
34 35 36 37
The relay bungalow in the southwest quadrant. The grade is rubber and asphalt. Track view facing west towards Pioneer Dr. Track view facing east towards 5th St.

.