200.31


607154R

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: None WCH Mechanical Bell 2nd Gen
Base: WCH 5" Single Sided ^ WCH 5" Single Sided ^
Lights: 7 - 12"x20" LEDs
1 - 12"x24" Hawker Safetran w/ LED
3 - 12"x24" Harmon w/ Harmon Fading LEDs
1 - 12"x20" Harmon w/ Harmon Fading LED
Junction Box: Unknown Unknown
Gate Lights: 4" RECO LEDs 4" RECO LEDs
Gate Mechanism: Safetran 1990s w/ Standard Mount WCH Style 3 w/ Standard Mount
Gate Striping: Vertical Striping Vertical Striping

All pictures were taken on May 2, 2022, by Tommy McGowan.
The video was taken on November 1, 2023, by Tommy McGowan.
This crossing is located on the CPKC Ottumwa Sub.

1 2
Overview of 2 gated signals facing south. Overview facing north.

Since this crossing is at the entrance to a cement plant, I opted not to get full upclose pictures as I don't know how tight security is here. Private Crossing is to the west and Cement #1 is to the east.