
|
|
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() |
|
Facing West.
|
Facing Southwest. A rear view of the mast
signals.
|
The Eastbound signal.
|
There are four signals at this crossing, two cantilever signals for the main roadway, plus two mast signals for a short roadway leading from a freeway off-ramp.
|
The Westbound signal.
|
Facing North. The Emmons St. and N. Center
Point Rd. (Hiawatha) crossings are visible.
|
Facing South.
|
The current arrangement of lights is the product of a mid-2005 partial LED upgrade. The front pair of cantilever lights along with the mast lights on the cantilever signals plus one of the mast signals received 12"x24" Safetran frames with Dialight ball LEDs. The rest of the lights are incandescent.
|
The Eastbound signal.
|
The Westbound signal. Note the missing
handrails on the cantilever.
|
The Eastbound signal again. Gravity had an
effect on the left mast light.
|
For Westbound traffic, the traffic signals will quickly cycle to green (if they aren't already green). For Eastbound traffic, the traffic signals will quickly cycle to red (if they aren't already red). After 10-15 seconds, the Westbound traffic signals will cycle to red, then all of the traffic signals will go into red flash mode until the train clears the crossing and the crossing signals deactivate.
The traffic signals at the two on/off ramp intersections West of the crossing are preempted when the crossing signals are activated. When preempted, the Westbound signals cycle to green while all other directions cycle to red. After about 10-15 seconds, all directions start flashing red.
|
Facing East.
|
The mast signals.
|
|
|
Facing East.
|
Another view of the Eastbound signal.
|
The Westbound signal.
|
|
Facing East.
|
A side view of the mast signals.
|
The mast signals for traffic turning
Eastbound off of the freeway off ramp.
|
|
A closer view of the Eastbound signal.
|
The Westbound signal.
|
|
I was in the area when this train came through.
|
The approaching train.
|
The signals have activated.
|
The train closes in on the crossing.
|
|
The train is entering the crossing.
|
||
|
Four locomotives are pulling a very long
train.
|
The left mast light was realigned.
|
The train continuing on its way.
|
|
A side view of the mast signals and a view of
the waiting traffic.
|
The train clears the crossing.
|
Traffic on this Saturday afternoon after the
train passed.
|
A saw this train and decided to stop for it also.
|
The crossing signals activate.
|
The train enters the crossing. A SD60F and a
SD40-2 are pulling this train.
|
|
|
The front cantilever lights have 12"x24"
Safetran frames with Dialight ball LEDs.
|
Gravity at work. This has since been fixed.
|
The rear cantilever lights have 12"x20"
Safetran incandescent lights.
|
|
The train clears the crossing.
|
Facing North. The rear end of the train is in
the distance.
|
|
|
The right mast signal. This signal has
12"x24" Safetran incandescent lights. The crossarm is from WABCO.
|
The left mast signal. This signal has 12"x24"
Safetran frames with Dialight ball LEDs.
|
||
In 2012, the crossing signals were upgraded. The old signals were replaced and gates were added.
|
The upgrade process has begun with the
installation of the new foundations and wiring.
|
|||
|
A foundation for a new cantilever.
|
Foundations for new mast signals.
|
||
|
Foundations for median signals.
|
The new cantilever will be closer to the road.
|
Facing West.
|
|
The new relay bungalow and parts for the new
signals.
|
Facing South. The median signals are a new
feature to this crossing.
|
|
The
upgrade is well underway as the new Eastbound cantilever, median
signals and offramp signals have been erected. The median signals
wouldn't get their lights until the upgrade was close to complete.
|
|||
|
A Safetran type-3 e-bell.
|
This GS bell would only be here temporarily.
|
The gates would be installed once the upgrade
was completed.
|
|
With the upgrade complete, the crossing
|
Facing
West. The lights consist of 12"x24: Safetran lightheads with Harmon
fading LEDs. The are also two electronic bells, both Safetran type-3.
They ring from startup till the gates lower.
|
|||
|
The median signals.
|
The Westbound cantilever.
|
||
|
The relay bungalow.
|
One of many ENS signs.
|
A Safetran base.
|
One of two Safetran type-3 e-bells.
|
|
More views facing West.
|
|||
|
Facing East.
|
|||
|
More views facing East.
|
|||
|
These signals serve the offramp.
|
|||
|
All of the gate motors are from Invensys.
|
Track views, facing South and North.
|
||
|
The relay bungalow.
|
The old relay cabinet is long gone.
|
The old 3M Programmed Visibility signals have
been replaced by signals made by Intelight.
|
|
At this location, the corporate boundaries of Cedar Rapids and Hiawatha run East-West along Blairs Ferry Rd.
Pictures 1-8 were taken January 27, 2008.
Pictures 9-21 were taken February 2, 2008.
Pictures 22-33 were taken February 23, 2008.
Pictures 34-46 were taken March 4, 2008.
Pictures 47-59 were taken June 16, 2012.
Pictures 60-67 were taken June 30, 2012.
Pictures 68-103 were taken July 21, 2013.