156.45


376026S

>>>>>>>>>>>>>>> Western Entrance Signal Western Exit Signal Eastern Entrance Signal Eastern Exit Signal
Bell: GS E Bell None GS E Bell None
Base: Siemens 5" Single Sided ^ Siemens 5" Single Sided ^ Siemens 5" Single Sided ^ Siemens 5" Single Sided ^
Lights: 8 - 12"x24" Safetran w/ GE Uniform Look LEDs 6 - 12"x24" Safetran w/ GE Uniform Look LEDs 6 - 12"x24" Safetran w/ GE Uniform Look LEDs 2 - 12"x24" Safetran w/ GE Uniform Look LEDs
Junction Boxes: Safetran Safetran Safetran Safetran
Gate Lights: 4" RECO 4" RECO 4" RECO 4" RECO
Gate Mechanism: Siemens Imprinted w/ GSI Gate Saver Siemens Imprinted w/ GSI Gate Saver Siemens Imprinted w/ GSI Gate Saver Siemens Imprinted w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping Vertical Striping Vertical Striping

The 1st video was taken in May 2020 by Kyle B Videography.
Pictures 1-32 and the 2nd video were taken on November 9, 2021.
Pictures 33-82 were taken on December 5, 2023.
All pictures and videos were taken by Tommy McGowan unless noted
This crossing is located on the CPKC Davenport Sub.

1 2
Overview of 2 gated cantilevers facing west. Overview facing east.
3 4 5
6 7 8
9 10 11
12 13 14 15
The eastern signal. Both signals had Harmon cantilevers, 12"x24" 1st Gen Harmon Dotted LEDs, and Safetran 2000s gate mechanisms. This one had a WCH Type 2 E Bell, which replaced a dead GS E Bell.
16 17 18
19 20 21
22 23 24
25 26 27 28
The western signal. This one had a 2nd Gen WCH Mechanical Bell.
29 30 31 32
The relay bungalow in the southeast quadrant. The grade is all concrete. Track view facing north towards Riverview Dr. Track view facing south towards 2nd Ave. S.

In 2023, CPKC replaced this whole setup with a new Siemens quad gated installation. I don't know why the cantilevers weren't carried over.

33 34
Overview of the new quad gates facing west. Overview facing east.
35 36 37
38 39 40
41 42 43
44 45 46 47
The new eastern entrance signal.
48 49 50
51 52 53
54 55 56
57 58 59 60
The new western entrance signal.
61 62 63 64
65 66 67 68
The new eastern exit signal.
69 70 71
72 73 74
75 76 77 78
The new western exit signal.
79 80 81 82
The new relay bungalow in the southeast quadrant. The grade is all concrete. Track view facing north towards Riverview Dr. Track view facing south towards 2nd Ave. S.