4.40


190370A

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: None NEG E Bell
Base: Safetran 5" Single Sided ^ Safetran 5" Single Sided ^
Lights: 3 - 12"x24" Safetran w/ 2nd Gen WCH LEDs
1 - 12"x24" Safetran w/ 2nd Gen WCH LEDs
4 - 12"x24" Safetran w/ 2nd Gen WCH LEDs
Junction Box: Safetran Safetran
Gate Lights: NEG Clear LEDs NEG Clear LEDs
Gate Mechanism: Invensys Rail w/ Old NEG 2 Way Saver Invensys Rail w/ Old NEG 2 Way Saver
Gate Striping: Vertical Striping Vertical Striping

All pictures and the 1st video were taken on June 11, 2020.
The 2nd video was taken on October 28, 2020.
The 3rd video was taken on May 28, 2021.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Clinton Sub.

These signals were installed around 2011 replacing EM signals.

1 2
Overview of 2 newer gated signals facing south. Overview facing north.
3 4 5
6 7 8
9 10 11
The northern signal.
12 13 14
15 16 17
18 19 20 21
The southern signal.
22 23 24 25
The relay bungalow in the southeast quadrant. The grade is all concrete. Track view facing west towards 9th Ave. Track view facing east towards 6th Ave. S & Dakin Rd. in Fulton, IL.
26
2 new relay bungalows sitting near the crossing. These would end up going to 210th Ave. and 250th Ave. in Grand Mound.