1.10


922305U

>>>>>>>>>>>>>> Eastern Signal Western Signal
Bell: WCH E-Bell WCH 2nd Gen Mechanical
Cantilever: Fabricated Metals N/A
Base: N/A SERRMI
Light Brackets: 3 - WRRS 1 - WRRS
1 - Safetran
Lights: 10 - 12"x24" WCH w/ WCH/Miller 1st Gen LEDs 2 - 12"x20" WCH incandescents
1 - 12"x20" Safetran incandescent
3 - 12"x24" Safetran incandescents

Pictures 1-26 were taken on July 10, 2023, by Hopen111.
Pictures 27-50 and the video were taken on June 20, 2024, by Hopen111.
This crossing is located on the UP Hollingsworth Industrial Lead.
Page created by Hopen111 (using HopenRXRTools 1.2.2).

1
2
Overview facing east. Overview facing west.
3 4 5 6
7 8 9 10
The eastern signal. Seems there used to be an older cantilever next to the current one seen on picture 9.
11 12 13
14 15 16
17 18 19
The western signal.
20
21
22
The relay case in the southwest quadrant. The tracks curve sharply before going straight for a bit. Then they turn beyond the trees and end up at the only customer on this spur.
The grade is all concrete, although very miscolored.
23
24
25
26
Track view facing north towards 1st St./63rd St. Track view facing south towards the end of the line. Road view facing east towards Park Ave. #2. The track date here says November 1926!

A return visit in June 2024 shows no changes have occured to the crossing.

27 28 29 30
31 32 33 34
35 36 37 38
39 40 41 42
43 44 45 46
47 48 49 50
The crossing in action! UP 562 and UP 1454 drop off two tanker cars at the nearby industry that this line solely serves.
The crossing turns on with only a handful of seconds to spare before the train goes over. The locomotives spent about 15-20 minutes at the industry before returning to the crossing.
The nearby traffic lights appear to be completely unassociated with the crossing, and no lights turned red when the crossing was active.