26.75


190398R

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: NEG E Bell NEG E Bell
Base: Siemens 5" Single Sided > Siemens 5" Single Sided >
Lights: 4 - 12"x24" Safetran w/ GE Pixelated Look LEDs 4 - 12"x24" Safetran w/ GE Pixelated Look LEDs
Junction Box: Safetran Safetran
Gate Lights: NEG Clear LEDs NEG Clear LEDs
Gate Mechanism: Siemens Imprinted w/ New NEG 2 Way Saver Siemens Imprinted w/ New NEG 2 Way Saver
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-25 and the 1st video were taken on June 23, 2020.
Pictures 26-33 and the 2nd video were taken on February 9, 2021.
The 3rd video was taken on March 10, 2021.
Pictures 34-41 were taken on April 8, 2021.
The 4th video was taken on May 12, 2021.
The 5th video was taken on May 28, 2021.
Picture 42 was taken on July 30, 2021.
Pictures 43-68 were taken on April 30, 2022.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the UP Clinton Sub.

These signals were installed in the 90s replacing crossbucks and were about to be replaced with new signals. Conduit was already in by this point.

1
2
Overview of two endangered 90s gated signals facing north. Overview facing south.
3 4 5
6 7 8
9 10 11
The southern signal. Both signals had Safetran bases, 12"x24" Harmon frames with 3 Electro-Tech's and one 1st Gen Harmon Dotted LED, a mix of Alstom and NEG Clear LEDs, and Safetran 1990s gate mechanisms.
12 13 14
15 16 17
18 19 20
21
The northern signal. This had a high tone 3rd Gen ASC E Bell.
22 23 24 25
The relay bungalow in the southwest quadrant. The grade is wood and concrete. Track view facing west towards 190th Ave. in Calamus. Track view facing east towards Williams St.
26
27
28 29 30
31 32 33
In February 2021, we see a new bungalow was installed behind the current one, and new foundations were at the ready. The bungalow had been sitting in Clinton since at least June 2020.
34 35 36
37 38 39 40
In April 2021, we see the foundation for the new southern signal had been installed, but the northern one's had been put in yet.
41
New signals were seen in Clinton. They were either for this crossing or 250th Ave.
42
In July 2021, we see the new foundation that was installed had its bolts and nuts removed and painted green. No idea why UP did this. By April 2022 however, the new signals were installed and activated.
43
44
Overview of the new Siemens signals facing north. Overview facing south.
45 46 47
48 49 50
51 52 53
54
The new southern signal.
55 56 57
58 59 60
61 62 63
64
The new northern signal.
65 66 67 68
The new relay bungalow in the southwest quadrant. The grade is wood and concrete. Track view facing west towards 190th Ave. in Calamus. Track view facing east towards Williams St.