Facing East. |
The Eastbound signal has one Safetran and three RACO 8" incandescent lights. |
||
A Safetran crossarm. |
A WRRS base. |
The Westbound signal. |
The
Eastbound signal has WRRS 8" incandescent lights. The front pair of
lights got smacked by something large enough to snap the crossarm. |
||
The tracks in either direction, Northwest and Southeast, respectively, are overgrown and haven't been used in years. |
||
The Eastbound signal. No changes here. |
||
The Westbound signal. No changes here either. |
|
The relay cabinet. |
||
Track
view, facing Southeast. At the time, the tracks in the distance were
still used up to a point roughly one-eighth of a mile South of the
crossing. At the time of these photos, a string of covered hoppers was
being stored on the line.
|
|
The
short stretch of track North of the crossing was washed out in a few
places. The side track to the industry North of the highway was also
removed.
|
|||
In 2013, what I thought would never happen, did in fact happen. The crossing was given a new life!
In
2013, the track and crossing were rebuilt in conjunction with the
construction of a new grain loading facility built just North of the
crossing. The old tracks were ripped up and a new roadbed was being
graded.
|
|||
These old signals would be removed shortly after these pictures were taken.
|
||
Out with the old, in with the new. New rail served business, new tracks, new crossing, new signals and new road surface to boot!
|
|||
The tracks are in the best shape they've been in a very long time!
|
|||
All
of the signal equipment is from WCH. All of the lightheads are 12"x20"
with 2nd gen LEDs. There is now a bell at this crossing, as the old
setup didn't include a bell.
|
|||
This is now an island approach crossing.
|
||
Pictures 1-11 taken February 16, 2008.
Pictures 12-13 taken July 12, 2008.
Pictures 14-27 taken March 18, 2010.
Pictures 28-34 were taken June 21, 2013.
Pictures 35-49 were taken November 9, 2013.