![]() |
![]() |
![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
| >>>>>>>>>>>>>> | Northern Signal | Southern Signal |
| Bell: | WCH E-Bell |
WCH E-Bell |
| Base: | WCH 5" Single Sided | WCH 5" Single Sided |
| Light Brackets: | WRRS | 2 - WRRS |
| Lights: | 4 - 12"x24" WCH w/ WCH/Miller 2nd Gen LEDs | 1 - 12"x24" Harmon w/
Electro-Tech LEDs 2 - 12"x24" WCH w/ GE Pixelated Look LEDs 3 - 12"x24" WCH w/ Electro-Tech LEDs |
| Gate Lights: | 3 - Electro-Tech 4" LEDs | 3 - Electro-Tech 4" LEDs |
| Gate Mechanism: | WCH Style 3.5 | WCH Style 3.5 |
| Gate Striping: | Diagonal Striping | Diagonal Striping |
| 1 |
2 |
| Overview facing north at a pair of 2000s era UP signals. | Overview facing south. |
| 7 |
8 |
9 |
10 |
| The signal base on
the northern signal is from WCH. |
The gate mechanism
on the northern signal is also from WCH. |
The light bracket
on the northern signal is from WRRS. |
| 15 |
16 |
17 |
18 |
| Close up at one of
the Electro-Tech gate lights. |
A look at the rear
lights on the northern signal. |
Back view of the
northern signal. |
| 25 |
26 |
27 |
28 |
| Close up at one of
the Electro-Tech LEDs in one of the side lights. |
The light bracket
for the side lights is from WRRS. |
The signal base on
the southern signal is from WCH. |
| 45 |
46 |
47 |
48 |
| The relay bungalow. | The grade is all concrete. | Track view facing
southeast towards Hoch Rd. The second bridge you see to the left was built up sometime around early 2006. UP was intending on double tracking this portion of the Kansas Sub, but plans must've fell through at some point |
Track view facing northwest towards Docking Rd. #2. |
| 52 |
53 |
54 |
| UP AC45CCTE #7412
leads a westbound manifest. |
A look at the
northern signal in action. |
A look at the
front lights on the northern signal in action. |