Videos 1-2 were originally taken on April 28, 2020, by KCMO Railfan
The 3rd video was taken on August 10, 2020, by Independence Railfanning.
The 4th video was taken on October 28, 2023, by KCMO Railfan.
Pictures 1-54 and the 5th video were taken on October 30, 2023, by KCMO
Railfan.
The 6th video was taken on April 6, 2024, by KCMO Railfan.
Pictures 55-63 and the 7th video were taken on July 19, 2024, by KCMO
Railfan.
This crossing is located on the UP Sedalia Subdivision with
Amtrak, and MNA having trackage rights.
Page created by KCMO Railfan. (using HopenRXRTools 1.0.3).
G1
G2
Older
low quality street view
from July of 2008 shows what the crossing
looked like back then. The signals were about 2 years old at the time
the Google car went by. These signals were installed for a brand new
Cargo Largo warehouse to be built next to the then current location. I
think the gate lights were 4 inch RECO incandescents at the time, and
the gates had the older striping. Then in 2011, the gate lights were
replaced to Electro-Tech, bell sequence was changed to have the bells
ring the entire time as back in 2008, this crossing and others in
Independence had the MoPac bell sequence.
G3
G4
Fast
forward to December of
2016, we see that the grade surface was
removed. No changes have occurred to the signals themselves at the
time. We see that in May of 2021, UP was replacing the ties along the
Sedalia Subdivision. Again, no changes have occurred to the signals at the
time. Then sometime in 2022, development for the new Cargo Largo
warehouse FINALLY started after decades of protecting nothing but an
open field. Groundbreaking happened on January 27th, 2022 after the
city cleared up the lot in late 2021. While the warehouse was under
construction, UP updated the gate striping to the current vertical
striping, and replaced the gate lights to the current NEG Clear LEDs.
The road was finally created sometime in 2023.
1
2
Overview facing east
with
Truman High School in the background, and also the new traffic lights
that were installed for the new intersection.
Overview facing west.
Currently the road ends at the barricades seen in the background.
Eventually new pavement will be added in order for the road to be fully
complete.
3
4
5
6
7
8
9
10
11
12
13
14
15
16
The western signal.
17
18
19
20
21
22
23
24
The western median signal.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
The eastern signal.
41
42
43
44
45
46
47
48
49
50
The eastern median signal.
51
52
53
54
The relay bungalow.
This crossing will eventually have an interconnection with the traffic
lights.
The grade is
nonexistant. It used to be a concrete grade until 2014 when UP removed
it.
Track view facing
north with 31st St. in the distance.
Track view facing
south with 35th St. in the distance.
A return visit on July 19, 2024, shows a
minor change to this crossing. It appears that sometime in the Spring
of 2024, UP finally added ENS signs here as this crossing lacked them
for the longest time. Also we find the signals in action for Amtrak
Missouri River Runner train 316! I do apologize for the subpar quality
in the pictures, these were taken with my phone.