173.36


472089J

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: WCH Mechanical Bell 1st Gen None
Cantilever: Safetran Cantilever Safetran Cantilever
Mast Base: Siemens 5" Single Sided ^ Siemens 5" Single Sided ^
Lights: 2 - 12"x20" Hawker Safetran incandescents
6 - 12"x20" Safetran incandsecents
8 - 12"x20" Safetran incandsecents
Junction Boxes: Safetran Safetran
Gate Lights: 4" RECO 4" RECO
Gate Mechanism: Siemens Imprinted w/ NEG 1 Way Saver Siemens Imprinted w/ NEG 1 Way Saver
Gate Striping: Vertical Striping Vertical Striping

All pictures were taken on October 11, 2023, by Tommy McGowan.
This crossing is located on the NS Lake Erie District.

1 2
Overview of 2 gated cantilevers facing north. Overview facing south.
3 4 5
6 7 8
9 10 11
12 13 14 15
The southern signal.
16 17 18
19 20 21
22 23 24 25
26 27 28 29
The northern signal.
30 31 32 33
The relay bungalow in the northeast quadrant. The grade is rubber and asphalt. Track view facing west towards Dille Rd. Track view facing east towards 289th St. in Wickliffe.

.