Pictures 1-25 were taken on September
21, 2016, by Tommy McGowan.
Pictures 26-37 and the 1st video were taken on April 7, 2023, by Tommy
McGowan.
The 2nd video was taken on October 7, 2023, by Nicholas
Miles/Northwestern Ohio Rail Productions.
The 3rd video was taken on February 29, 2024, by Nicholas
Miles/Northwestern Ohio Rail Productions.
Pictures 38-41 were taken on July 27, 2025, by Nicholas
Miles/Northwestern Ohio Rail Productions.
This crossing is located on the CSX Willard Sub.
In April 2023, we see the lights were
upgraded to LED. However, since I was in a hurry, what I didn't realize
is the western signal was actually replaced entirely. The "new" signal
is a reused 1980s Safetran signal, likely from Vine St. after that
crossing closed. I don't know why this signal was replaced, but likely
it was due to being knocked down. The eastern signal's gate was also
replaced.
NOVEMBER 2025 UPDATE: Sir Fluent here. Since
Tommy was last out here, 2 minor changes were made to the crossing.
38
39
40
41
In July 2025, Nicholas Miles discovered
the dead NEG E-Bell on the western signal was replaced with a new NEG
E-Bell, and one of the gate lights on the eastern signal was replaced
with an NEG LED gate light.