Pictures 1-45 were taken on May 10,
2017.
Pictures 46-61 were taken on October 25, 2018.
Pictures 62-103 were taken on September 11, 2020.
The video was taken on November 25, 2023, by Nicholas
Miles/Northwestern Ohio Rail Productions.
All pictures were taken by Tommy McGowan.
This crossing is located on the south track of the CSX Mt. Victory Sub.
1
2
Overview of 2 very
old cantilevers and pedestrian gates facing north.
Overview facing south.
3
4
5
6
7
8
9
10
11
12
13
14
15
The southern signal.
This had 5 Safetran 8" lights and 3 GRS 8" lights at the time.
16
17
18
19
20
21
22
23
24
25
26
27
28
29
The southern signal. This had all
8" GRS lights at the time.
30
31
32
33
34
35
The southern pedestrian gate.
36
37
38
39
40
41
The northern pedestrian gate. This
has a very old pedestrian WRRS gate mechanism.
The updated southern signal. The
rear overhead lights had its backgrounds cut down to allow the gate to
pass through.
55
56
57
58
59
60
61
The updated northern signal. This
also had its rear overhead backgrounds cut down.
In 2020, just a couple years after all
the lights on the old signals were upgraded to LED, these signals were
replaced with 2 brand new cantilevers and both pedestrian gate masts
had the gates removed without replacement, just leaving the No Left
Turn lights on them.
62
63
Overview of
the new signals facing north.
Overview
facing south.
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
The new southern signal.
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
The new northern signal.
96
97
98
99
The updated pedestrain gates, sans
pedestrian gates.