MP: 0.57 |
Updated November 2026
Total Accidents:
1
Crossing DOT #: 258792M
TOTAL WEEKLY
TRAINS: 1 (AS OF 2024)
| >>>>>>>>>>>>>> | Northern Signal | Southern Signal |
| Bell: | N/A | N/A |
| Base: | WRRS 5" Single Sided |
WRRS 5" Single Sided |
| Cantilever: | Progress Rail | Safetran |
| Lights: | 12 - 12"x24" WCH Flatback w/ GE Uniform Look LEDs | 8 - 12"x24" WCH Flatback w/ GE Uniform Look LEDs |
| Light Brackets: | 4 - Progress Rail |
2 - WCH |
| Gate Lights: | 3 - NEG 4" incandescents | 3 - NEG 4" incandescents |
| Gate Mechanism: | Federal Signal w/ Standard Mount |
Safetran 2000s w/ Standard Mount |
| Gate Striping: | Diagonal Striping | Diagonal Striping |
Page created by: Ethan the Railfanner
Pictures 1-25 were taken on May 10, 2024, by Ethan the Railfanner.
Pictures 26-33 were taken on July 18, 2026, by Sir Fluent.
This crossing is located on a connector track between the IORY DT&I South Subdivision and NS Dayton District.
| PUCO images from the late 90s or early 2000s
showing 2 older gated signals with 8" lights, FS gate mechanisms and no
bells. By 2024, the northern signal's cantilever was replaced with a
newer Progress Rail signal and the southern signal's gate mechanism was
replaced. |
|||
|
Overview of 2 gated cantilevers facing
south.
|
Overview facing north.
|
|
The northern signal.
|
|||
|
The southern signal. This had all 8" RACO incandescents at this point.
|
|||
|
The relay case.
|
| In July 2026, we see the southern signal's lights were upgraded to LED. |
|||