7.10


980075C

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: GS Type 2 E-Bell GS Type 2 E-Bell
Cantilever: PPI PPI
Base: PPI 5" Single Sided PPI 5" Single Sided
Light Brackets: 3 - WRRS 3 - WRRS
Lights: 8 - 12"x20" WCH w/ RRSC LEDs 7 - 12"x20" WCH w/ RRSC LEDs
1 - 12"x20" WCH w/ Electro-Tech's LEDs
Gate Lights: 3 - NEG Clear LEDs 3 - NEG Clear LEDs
Gate Mechanism: Siemens Imprinted Siemens Imprinted
Gate Striping: Vertical Striping Vertical Striping

The 1st video was taken on October 18, 2024, by Angels Railfan And More.
The 2nd video was taken on August 20, 2025, by Portland Westside Railfan.
Pictures 1-40 and the 3rd video were taken on December 6, 2025, by Rio Salado The Railfan.
Pictures 41-57 and the 4th video were taken on June 10, 2026, by Rio Salado The Railfan.
This crossing is located on the TriMet MAX Blue and Red Lines.
Page created by Rio Salado The Railfan (using HopenRXRTools 1.3.0).

1
2
Overview facing north.Overview facing south.
3 4
5 6 7
8 9 10 11
12 13 14 15
16 17 18 19
The northern signal.
20 21
22 23 24
25 26 27 28
29 30 31 32
33 34 35 36
The southern signal.
37
38
39
40
The relay bungalow.The grade is all concrete.Track view facing east towards 114th Ave.Track view facing west towards Lombard Ave. #1.

A return visit in June 2026 by Rio Salado The Railfan shows gate mechanism changes!

41 42 43
The northern signal with the new gate mechanism.
44 45 46
The southern signal with the new gate mechanism.
47 48 49
50 51 52 53
54 55 56 57
The crossing in action!