749319D


>>>>>>>>>>>>>> Northern Signal
Southern Signal
Bell:
NEG E-Bell
GS Type 2 E-Bell
Base:
Safetran 5" Single Sided
WABCO 5" Single Sided
Light Brackets:
2 - WABCO
WRRS
Lights:
6 - 12"x20" WABCO w/ Leotek IL Series LEDs
4 - 12"x20" WCH w/ Leotek IL Series LEDs
Gate Lights:
3 - Unknown 4" LEDs
3 - NEG Clear LEDs
Gate Mechanism:
WABCO Model 75
WABCO Model 75
Gate Striping:
Diagonal Striping
Vertical & Diagonal Striping


Pictures 1-5 and the 1st audio were taken sometime in 2006, by Andrew Fields.

Pictures 6-13 were taken sometime in late 2006, by Andrew Fields.

The 1st video was taken on February 21, 2007, by Andrew Fields.

Pictures 14-18 and the 2nd audio were taken sometime in 2007, by Andrew Fields.

The 2nd video was taken on December 16, 2025, by Rio Salado The Railfan.

Pictures 19-43 were taken on February 12, 2026, by Rio Salado The Railfan.

This crossing is located on the PNWR Tillamook District.

 

1

2

3

Here's a rare sight: Two complete 8" signals with triangle gates! They still get regular usage, and work and sound great.

Picture 3 has a rail sticking up. This is an older version of guard rails, unfortunately, it isn't a very good means of protection for the signals.

4

5

A side view of the crossing, including a view of the other signal.
I'd love to see more pictures in action.

 

CLICK THE ICON TO THE LEFT TO HEAR THE CROSSING IN ACTION.

(RECORDED SOMETIME IN 2006)



 

 

6

7

8

9

An old SP DOT number on one of the masts.
The north signal.
A close-up of the very old WABCO lights.
The south signal.

10

11

12

13

The triangle gates are officially known as WABCO type LW.
The rear of the north signal. The double crossbuck is kind of an old touch here.
Facing West.
Facing East.

 

 

14

15

16

17

P&W's crews must have a death wish on all 8" classic signals...

They've done it again, by upgrading the crossing with 12"x20" signals!

 

The 12" lights are older WCH lights, and are incandescent. Both bells though have been replaced with General Signals electronic bells.

18

Three pairs of WCH lights up close...

This upgrade should NOT have happened at all, but at least P&W could've done worse...

 

CLICK THE ICON TO THE LEFT TO HEAR THE CROSSING IN ACTION.
(RECORDED DECEMBER 2007)



 


A return visit in February 2026 by Rio Salado The Railfan shows an LED upgrade and a replacement bell!

19
Overview facing north.
20 21 22
23 24 25
26 27 28 29
The northern signal.
30 31 32
33 34 35
36 37 38 39
The southern signal.
40
41
42
43
The relay case.The grade is all concrete.Track view facing east towards Hocken Ave. #1.Track view facing west towards Murray Blvd.