9.20,25.66

 

980083U,077838X

 

NOTE: THE 2ND DOT NUMBER ABOVE (077838X) BELONGED TO P&W. THEY ABANDONED THEIR TRACK, SO NOW JUST MAX OWNS THE CROSSING.

 

>>>>>>>>>>>>>>Northern SignalSouthern Signal
Bell:GS Type 3 E-BellGS Type 2 E-Bell
Cantilever:SafetranSafetran
Base:PPI 5" Single SidedPPI 5" Single Sided
Light Brackets:2 - Safetran
1 - WRRS
2 - Safetran
1 - WRRS
Lights:6 - 12"x20" Safetran w/ RRSC LEDs
2 - 12"x20" WCH w/ RRSC LEDs
5 - 12"x20" Safetran w/ RRSC LEDs
1 - 12"x20" Safetran w/ Electro-Tech's LEDs
2 - 12"x20" WCH w/ RRSC LEDs
Gate Lights:3 - NEG Clear LEDs3 - NEG Clear LEDs
Gate Mechanism:Siemens ImprintedSiemens Imprinted
Gate Striping:Vertical StripingVertical Striping


>>>>>>>>>>>>>>Eastern Pedestrian Signal
Bell:NOVAX DS100
Base:WCH 4" Single Sided
Lights:4 - WCH Red LEDs

Pictures 1-3 were taken sometime in 2005, by Andrew Fields.
Pictures 4-11 were taken on January 2, 2006, by Andrew Fields.
The audio was taken sometime in January 2006, by Andrew Fields.
The video was taken on June 25, 2025, by Portland Westside Railfan.
Pictures 12-68 were taken on February 20, 2026, by Rio Salado The Railfan.
This crossing is located on the TriMet MAX Blue and Red Lines.

200 Trains (100 each way) come by on Monday-Thursday, and 204 (102 each way) on Friday.
168 trains (84 each way) come by on Saturday, and 140 (70 each way) come by on Sunday.

1

2

3

Take a look at this MAX crossing. The lights on the mast in both pictures 2 and 3 show both lights lit when all the others aren't. Kind of seems a little unusual? I'm assured it isn't a malfunction but is something a little different.

 

The crossing has now gone all L.E.D. The bells have thought to go to General Signals Type 2 electronic bells, but listen to the audio clip below, and you'll hear that the mechanical bells were untouched.

 

4

5

6

7

The opposite view of the crossing.
Track views. On picture 6, the left 2 tracks are for MAX, while the right one is for P&W.
2 relay cases! The left is for MAX, and the other is for P&W.

8

9

10

11

The signals activate for a MAX train!

These pictures were taken January 2, 2006.

 

CLICK THE ICON TO THE LEFT TO HEAR THE CROSSING IN ACTION.

(RECORDED SOMETIME IN JANUARY 2006)



 


A return visit in February 2026 by Rio Salado The Railfan shows gate mechanism changes!

12
13
Overview facing north.Overview facing south.
14 15
16 17 18
19 20 21 22
23 24 25 26
27 28 29 30
The northern signal.
31 32 33
34 35 36
37 38 39 40
41 42 43 44
45 46 47 48
The southern signal.
49 50
51 52 53
The eastern pedestrian signal.
54
55
56
57
The relay bungalow.The grade is all concrete.Track view facing east towards Beaverton Creek.Track view facing west towards Merlo Rd./158th Ave.
58 59 60
61 62 63 64
65 66 67 68
The crossing in action!