| >>>>>>>>>>>>>> | Northern Signal | Northern Median Signal | Southern Signal |
| Bell: | WCH E-Bell | GS Type 1 E-Bell | GS Type 2 E-Bell |
| Cantilever: | PPI | PPI | PPI |
| Base: | US&S 5" Single Sided | PPI 5" Single Sided | US&S 5" Single Sided |
| Light Brackets: | 3 - WRRS
1 - PPI
1 - MI | 2 - WRRS
1 - PPI | 3 - WRRS |
| Lights: | 12 - 12"x24" WCH w/ Miller Ingenuity 1st Gen LEDs
2 - 12"x20" WCH w/ Aurora Clear LEDs | 6 - 12"x24" WCH w/ Miller Ingenuity 1st Gen LEDs
2 - 12"x20" WCH w/ Aurora Clear LEDs | 6 - 12"x24" WCH w/ Miller Ingenuity 1st Gen LEDs
2 - 12"x20" WCH w/ Aurora Clear LEDs |
| Gate Lights: | 3 - NEG Clear LEDs | 3 - NEG Clear LEDs | 3 - NEG Clear LEDs |
| Gate Mechanism: | Siemens Imprinted | Siemens Imprinted | Siemens Imprinted |
| Gate Striping: | Vertical Striping | Vertical Striping | Vertical Striping |
| >>>>>>>>>>>>>> | Eastern Pedestrian Signal | Western Pedestrian Signal |
| Bell: | NOVAX DS100 | NOVAX DS100 |
| Base: | L&W 5" Single Sided | L&W 5" Single Sided |
| Gate Lights: | 4 - WCH Red LEDs | 4 - WCH Red LEDs |
Pictures 1-6 and the 1st audio were taken sometime in 2005, by Andrew Fields.
Pictures 7-10 and the 2nd audio were taken sometime in 2006, by Andrew Fields.
The 1st video was taken on September 7, 2024, by The BC Railfan.
Videos 2-5 were taken on March 4, 2025, by Portland Westside Railfan.
Pictures 11-78 and videos 6-8 were taken on December 6, 2025, by Rio Salado The Railfan.
The 9th video was taken on March 19, 2026, by Portland Westside Railfan.
Pictures 79-81 and videos 10-11 were taken on March 27, 2026, by Rio Salado The Railfan.
The 12th video was taken on April 23, 2026, by Rio Salado The Railfan.
Pictures 82-142 and videos 13-14 were taken on June 5, 2026, by Rio Salado The Railfan.
Pictures 143-192 and videos 15-18 were taken on June 10, 2026, by Rio Salado The Railfan.
This crossing is located on the TriMet MAX Blue and Red Lines.
200 Trains (100 each way) come by on Monday-Thursday, and 204 (102 each way) on Friday.
168 trains (84 each way) come by on Saturday, and 140 (70 each way) come by on Sunday.
|
1
|
2
|
3
|
|
Another interesting
crossing. There are 3 cantilevers instead of the usual 2 or 4 you find.
The lights are 12"x20"/12"x24" L.E.Ds with WCH type 2 electronic bells
that turn off after the gates lower. This crossing is owned by MAX.
|
4
|
5
|
6
|
|
The lights are the clear type L.E.D.
|
Here's a weird pedestrian signal that's just
two 7" gate lights next to each other with an electronic bell that has
a General Signals Type 2 chip implanted in it.
|
A broad view of the crossing in 2005. There
have been very minor changes.
|
|
|
CLICK THE ICON TO THE LEFT TO HEAR THE CROSSING IN
ACTION.
(NOTE: THE WCH AND GENERAL SIGNAL TYPE 1 BELLS SHUT OFF WHEN THE GATES
FULLY LOWER, AND THE NEW BREED OF GS TYPE 2 BELL CONTINUE RINGING.)
(RECORDED SOMETIME IN 2005)
|
|
7
|
8
|
Here's a close-up of the WCH electronic bell.
You can also see WCH L.E.D. gate lights have replaced the
older 7" gate lights.
|
A sign telling pedestrians to look both ways
for trains that supposedly come by every 8 minutes or so.
|
9
|
10
|
Here's a view of the other side of the crossing. Something
that I noticed, is that the median signal on the other side of the
crossing, and the signal on picture 9 here, both have General Signals
type 1 bells, while the WCH type 2 still exists on the far left signal.
|
A night-time shot of the crossing on a
time-lapse delay.
|
|
|
CLICK THE ICON TO THE LEFT TO HEAR THE CROSSING IN
ACTION.
(NOTE: THE
WCH AND GENERAL SIGNAL TYPE 1 BELLS SHUT OFF WHEN THE GATES
FULLY LOWER, AND THE NEW BREED OF GS TYPE 2 BELL CONTINUE RINGING, WITH
A VERY NOTICABLE PAUSE IN LOOPING.)
(RECORDED SOMETIME IN 2006)
|
|
On December 6, 2025, Rio Salado The Railfan made a return trip to see minimal changes and bell corrections.
Another return visit in March 2026 by Rio Salado The Railfan shows that one of the gate mechanisms have been replaced!
A 3rd return visit in June 2026 by Rio Salado The Railfan shows another gate mechanism change!
A 4th return visit by Rio Salado The Railfan shows a 3rd gate mechanism change! Surprisingly, this was a few days later after the 2nd gate mechanism replacement!