4.00

 

980062B


>>>>>>>>>>>>>>
Eastern Signal
Western Signal
Bell:
GS Type 2 E-Bell
GS Type 3 E-Bell
Base:
WCH 5" Single Sided
WCH 5" Single Sided
Light Brackets:
WRRS
WRRS
Lights:
4 - 12"x20" WCH w/ RRSC LEDs
4 - 12"x20" WCH w/ RRSC LEDs
Gate Lights:
3 - NEG Clear LEDs
3 - NEG Clear LEDs
Gate Mechanism:
Siemens Imprinted
Siemens Imprinted
Gate Striping:
Vertical Striping
Vertical Striping


Pictures 1-15 were taken sometime in 2006, by Andrew Fields.

The 1st video was taken on July 22, 2024, by Washington State Railfan.

Videos 2-3 were taken on January 27, 2025, by Portland Westside Railfan.

Pictures 16-49 and videos 4-5 were taken on January 4, 2026, by Rio Salado The Railfan.

This crossing is located on the TriMet MAX Red Line.


142 Trains (71 each way) come by Monday-Friday.

130 trains (65 each way) come by on Saturday, and 124 (62 each way) come by on Sunday.


Just as a little bit of trivia, the RED line opened on September 10, 2001.

The road was created in 2000 or 2001 for this line to lead into the Portland International Airport.


1

2

3

Here's another one of MAX's many crossings. As per usual MAX crossings, the signals have GS type 2 electronic bells that shut off when the gates lower completely, as well as 12"x20" L.E.D. lights made by RSI, and WCH L.E.D. gate lights.

 

Picture 3 shows the signals starting up for another MAX train to come by. This crossing is on the MAX red line, whereas most of the Hillsboro and Beaverton MAX crossings are on the MAX blue line.

4

5

6

The train crosses in picture 5, then the gates rise in picture 6.

7

8

Facing South-SouthWest.
A US&S model 95 gate motor.
9
10
11
12
A closeup of one of the GS bells.
A wide view of the crossing from a pedestrian walkway in the median!
The last station stop before the airport.
A rear view of the westbound signal.
13
14

15

You can see how close the crossing is to the airport.
The relay case. There's some data on the relay case, but no DOT number.
A Stop line for the sidewalk crossing the tracks. This kind of design is used at all MAX crossings.

On January 4, 2026, Rio Salado The Railfan made a return trip to see that the gates were replaced after A Better Red project in 2023.

16
17
Overview facing east.Overview facing west.
18 19 20
21 22 23
24 25 26 27
The eastern signal.
28 29 30
31 32 33
34 35 36 37
The western signal.
38
39
40
41
The relay bungalow.The grade is all concrete.Track view facing north towards 82nd Way.Track view facing south towards Mt. St. Helens Ave. #1.
42 43 44 45
46 47 48 49
The crossing in action!