Pictures 1-6 were taken on August 11, 2009, by Andrew Fields.
Pictures 7-38 and the video were taken on November 24, 2025, by Portland Westside Railfan.
This crossing is located on the TriMet MAX Green Line.
136 (68 each way) trains come by on Weekdays, 106 (53 each way) on Saturdays, and 98 (49 each way) on Sundays.
1
2
3
Facing east on Flavel. The overpass in the
background is Interstate 205.
Taking a look at the dual WCH E-bells, one on
the cantilever and the other on the mast.
Facing south. This platform stop is marked as
Flavel Street.
4
5
6
Facing north. As you can see,
the line rises to be close to level with the freeway.
Facing west on Flavel.
This banner informs would-be riders that
while trains are testing, they are not taking on passengers.
This brand new crossing is on an expansion of the MAX Green Line that opened for business on September 12, 2009.
On
November 24, 2025, Portland Westside Railfan made a return trip to see
changes with the gates at this crossing with other equipment unchanged.