Pictures 1-7 were taken sometime in 2006, by Andrew Fields. The 1st video was taken on November 1, 2022, by Josiah Duarte Productions. The 2nd video was taken on February 22, 2023, by Josiah Duarte Productions. The 3rd video was taken on July 18, 2023, by Josiah Duarte Productions. The 4th video was taken on April 26, 2025, by Union Pacific 7999. Pictures 8-56 and the 5th video were taken on September 20, 2026, by Rio Salado The Railfan. This crossing is located on the UP Brooklyn Sub.
This crossing became a quiet zone in May 2017. 2 pedestrian gateless signals were installed at the same time during the QZ conversion. The road divider was installed in 2015 in preparation as well.
1
2
3
Facing East. This is another 12"x24" cantilever setup with mechanical bells.
From Andrew: The spur in the bottom left of the frame goes back about 100 yards before it dead-ends at an intersection. Those tracks then continue after that intersection. Now here's the weird part...they're still in use and trains can only cross that intersection when temporary 'snap tracks' have been put together over the street and sidewalk. It is usually only done for the Oregon State Fair and last saw use in 2004.
4
5
6
Facing West.
An older style sign that Andrew thinks is back from the 1960s.
Facing North.
7
A memorial sign to one of the 2 pedestrians killed at the crossing.
The latest FRA report from 1988 does not mention the cantilever upgrade.
A return visit in September 2026 by Rio Salado The Railfan shows changes plus an addition of 2 pedestrian signals!
8
9
Overview of 2 gated cantilevers and 2 pedestrian signals facing east.