37.51

 

 

058301J

 

>>>>>>>>>>>>>>Northeastern SignalNorthwestern SignalSoutheastern SignalSouthwestern Signal
Bell:WCH E-BellN/AN/AWCH 1st Gen Mechanical
Base:Siemens 5" Single SidedL&W 5" Double SidedL&W 5" Double SidedSafetran 5" Single Sided
Light Brackets:SafetranHarmonHarmonSafetran
Lights:3 - 12"x24" Safetran w/ Dialight Low Wattage LEDs
1 - 12"x24" Safetran w/ Harmon Fading LEDs
2 - 12"x24" Harmon w/ GE Uniform Look LEDs2 - 12"x24" Harmon w/ GE Uniform Look LEDs4 - 12"x20" Safetran w/ GE Uniform Look LEDs
Gate Lights:3 - NEG Clear LEDs3 - NEG 4" LEDs3 - NEG 4" LEDs3 - NEG Clear LEDs
Gate Mechanism:Siemens ImprintedSafetran 2000sSafetran 2000sSafetran 2000s
Gate Striping:Vertical StripingDiagonal StripingDiagonal StripingVertical & Diagonal Striping

Pictures 1-6 were taken sometime in early 2007, by Andrew Fields.
Pictures 7-14 were taken February 24, 2009, by Andrew Fields.
The 1st video was taken on August 1, 2024, by Portland Westside Railfan.
Pictures 15-62 and videos 2-3 were taken on May 1, 2026, by Rio Salado The Railfan.
The 4th video was taken on May 1, 2026, by Portland Westside Railfan.
This crossing is located on the PNWR OE District.

P&W gets 8 daily trains, and WES gets 32 daily trains.

 

1

2

3

The Westbound signal with Safetran 12"x20" incandescent lights, but a WCH mechanical bell on top.

Facing North.

Facing South.

You can see a private crossing in the distance.

4

5

6

The Eastbound signal with identical equipment to the westbound one.

The relay case without any DOT information on it.

An overview of the crossing.

 

These pictures were taken sometime in early 2007 before WES came around.

 

7

8

9

Amazingly, when WES came along, the old signals were kept in place! The old signals still exist with freshly painted WCH mechanical bells. A train approaches in picture 8.

An overview of the crossing.

10

11

12

The signals activate. Against what P&W has done to other crossings that WES uses, this crossing still has incandescent lights!

13

14

WES crosses...
And the gates rise while the bells go silent.

Note: The bells ring from startup to when the gates begin to rise.

 

Pictures 7-14 were taken February 24, 2009.


A return visit in May 2026 by Rio Salado The Railfan shows that one signal has been replaced, and the exit signals were added on!

15
16
Overview facing east.Overview facing west.
17 18 19 20
21 22 23 24
25 26 27 28
The northeastern signal.
29 30 31 32
33 34 35 36
The northwestern signal.
37 38 39 40
41 42 43 44
The southeastern signal.
45 46 47
48 49 50
51 52 53 54
The southwestern signal.
55
56
57
58
The relay bungalow.The grade is concrete.Track view facing north towards Teton Ave. #2.Track view facing south towards Industrial Way.
59 60 61 62
The crossing in action!