Gate Mech slid down to the base!

Talk about crossing signal lights, bells, and gates here.

Moderators: freebrickproductions, mlgillson, TommyBNSF, Raco_GS

User avatar
Swedish Crossings
Posts: 116
Joined: Sun Mar 12, 2017 5:48 pm
Location: Ljungskile, Bohuslän, Sweden
Contact:

Gate Mech slid down to the base!

Post by Swedish Crossings » Fri Feb 28, 2020 11:21 am

https://www.google.com/maps/@33.9893667 ... 384!8i8192
Found this while looking around today :ROFL: :ROFL:
"Trains are the way to travel"
Image
User avatar
freebrickproductions
Posts: 8494
Joined: Thu Jun 07, 2012 11:12 am
Location: Huntsville, AL
Contact:

Re: Gate Mech slid down to the base!

Post by freebrickproductions » Fri Feb 28, 2020 2:23 pm

Swedish Crossings wrote:
Fri Feb 28, 2020 11:21 am
https://www.google.com/maps/@33.9893667 ... 384!8i8192
Found this while looking around today :ROFL: :ROFL:
Been that way for a long time:
https://www.google.com/maps/@33.9893676 ... 384!8i8192

Still that way in 2019:
https://www.google.com/maps/@33.9893667 ... 384!8i8192
They/Them for me, please.

Click here if you want to submit crossing photos to the site!

Avatar by runesprite on Twitter.
User avatar
NathanFromEngland
Posts: 2370
Joined: Sat Apr 29, 2017 3:52 pm
Location: Merseyside

Re: Gate Mech slid down to the base!

Post by NathanFromEngland » Fri Feb 28, 2020 3:24 pm

Most of the crossing there are so poorly maintained to be honest.

This really irritated me though, new signal lacking gate and damaged lighthead!
https://www.google.com/maps/@33.9892998 ... 312!8i6656

Rather interestingly, it uses an Invensys mechanism, the line is also BNSF owned but it seems as if they don't care about the way the signals are kept, not sure why the FRA isn't chasing them up about the condition of them.
Refer to me as 'Nari' - She/They are my preferred pronouns
User avatar
freebrickproductions
Posts: 8494
Joined: Thu Jun 07, 2012 11:12 am
Location: Huntsville, AL
Contact:

Re: Gate Mech slid down to the base!

Post by freebrickproductions » Fri Feb 28, 2020 7:07 pm

It's probably a lightly-used branch line.
They/Them for me, please.

Click here if you want to submit crossing photos to the site!

Avatar by runesprite on Twitter.
flat train
Posts: 142
Joined: Tue Dec 03, 2019 1:14 pm
Location: Los Angeles, CA

Re: Gate Mech slid down to the base!

Post by flat train » Sat Feb 29, 2020 1:02 pm

Those crossings are on the abandoned BNSF harbor sub. Its all being torn up soon for a light rail line. Also I live close to those crossings so maybe I can get a couple pics! Also have you found any rare crossing stuff in LA? Thanks!
User avatar
SirKrunch
Posts: 810
Joined: Sun Feb 01, 2009 4:09 am
Location: Story City, Iowa
Contact:

Re: Gate Mech slid down to the base!

Post by SirKrunch » Sat Feb 29, 2020 1:51 pm

You have to trace back to the East a long way... first you'll come across a removed diamond. If you go Eastward more, you'll find the end of the inactive track, removed rail and a derail at this location.
Well, :Censored:
User avatar
SirKrunch
Posts: 810
Joined: Sun Feb 01, 2009 4:09 am
Location: Story City, Iowa
Contact:

Re: Gate Mech slid down to the base!

Post by SirKrunch » Sat Feb 29, 2020 2:00 pm

Curious about this signal's meaning further up the active (maybe?) portion of the line...
Well, :Censored:
User avatar
freebrickproductions
Posts: 8494
Joined: Thu Jun 07, 2012 11:12 am
Location: Huntsville, AL
Contact:

Re: Gate Mech slid down to the base!

Post by freebrickproductions » Sun Mar 01, 2020 12:45 am

flat train wrote:
Sat Feb 29, 2020 1:02 pm
Those crossings are on the abandoned BNSF harbor sub. Its all being torn up soon for a light rail line. Also I live close to those crossings so maybe I can get a couple pics! Also have you found any rare crossing stuff in LA? Thanks!
That line would be a good place to start. Some nice old & classic equipment along both the abandoned and active portions of it.
They/Them for me, please.

Click here if you want to submit crossing photos to the site!

Avatar by runesprite on Twitter.
User avatar
threepea11
Posts: 15
Joined: Sun May 15, 2022 3:21 pm

Re: Gate Mech slid down to the base!

Post by threepea11 » Sun Jul 03, 2022 6:03 pm

I am quite a bit late but i have recorded quite a bit of these crossing on the active portion of the Harbor Sub, the entire line used to get 2 dozen trains a day until it was replaced by the Alameda Corridor in 2002, today, the 2nd half of the line is still used with about 4 trains a day. The Malabar yard on the beginning of the line in Vernon is also used about 2 times daily but will close some time next year, the reason some of the crossings on the abandoned portion were upgraded and replaced was in case the Alameda corridor would have an emergency, BNSF trains could run down the Harbor Line. So they maintained some of the signals until about 2017, when LA Metro bought the entire line, even the active portion, they plan to turn the abandoned portion into a light rail, although progress has been made, it is taking a loooonnng time. Just about every signal except for some of the crossing next to malabar yard and the active portion have been removed. I should have documented these signals but i was 1 year too late. The Harbor Sub is my fave line in LA, I always enjoy seeing and recording those old installs!
https://youtu.be/q8DLvJ-TPeI
The Harbor sub is (was) filled with WRRS and RACO installs, with some of the bells being side mounted! About 1/3 of the line had extremely rare GRS Type D gate mechs, I believe only 2 are on active lines now, both in the greater LA area. I believe BNSF knows this line is a fan fave so they try not to replace much stuff, the most bizzare thing they have done on this line was replaced a RACO bell with a GS Type 3 and then replace that with a WCH Mech bell. In a span of 3 years. Most of the crossings on the line are quite original as well, most are 1960s ATSF installs with some 80s stuff sprinkled in there as well.

Ive said too much have I?
Post Reply