25.677


204025677

>>>>>>>>>>>>>> Northern Signal (S2)
Southern Signal (S1)
Bell: EHL-S10 EHL-S10
Gate Mechanism: S6 JEGD-50 (Renovated By SPAI Katowice) S6 JEGD-50 (Renovated By SPAI Katowice)
Signal: EHZ-75 EHZ-75
Control System: ZWUS SPA-2A (Renovated By Monat) ZWUS SPA-2A (Renovated By Monat)
Sensors: RSR-180 RSR-180

Pictures 1-8 were taken on June 27, 2024, by ElectroTiel.
This crossing is located on Railway Line No. 204.
Page created by Hopen111 (using HopenRXRTools 1.2.2).

SV1
Street View from Aug 2012 showing the older crossing install that was replaced.
1
2
Overview facing north. Overview facing south.
3 4 5
Close-up of S6 JEGD-50 gate mechanism. It has been renovated by SPAI Katowice at one point in the past.
The northern signal. Labeled S2.
6 7
The southern signal. Labeled S1.
8
The relay bungalow in the southwest quadrant.