752.60

 

 

414819Y

 

Page created by: Josh Baumann.

Photos taken by Josh Baumann on May 30, 2009.

 

1

2

3

4

Overall view facing east.
The eastbound signal, which has the only cantilever at the crossing.
An electronic bell by US&S.
Overall view facing east.

 

This area is under construction for the DART "Green Line" light rail expansion. The concrete pylons seen in several of these photos show where the DART tracks will be grade-separated, while the DGNO freight line crossing will continue to be at-grade.

 

5

6

7

The westbound signal. Notice the construction sign that says: "Zone 2 - Check in/out with flagman".
The equipment bungalow with no DOT information.