| >>>>>>>>>>>>>> |
Northern
Signal |
Southern
Signal |
| Bell: |
WCH E-Bell |
WCH E-Bell (Dead)
|
| Base: |
Safetran 5" Single Sided |
Safetran 5" Single Sided |
| Light Brackets: |
Safetran |
Safetran |
| Lights: |
4 - 12"x20" Safetran w/
Electro-Tech LEDs |
3 - 12"x20" Safetran w/
Electro-Tech LEDs 1 - 12"x24" Safetran w/ GE Pixelated Look LEDs |
| Gate Lights: |
3 - NEG 4" LEDs |
3 - NEG Clear LEDs |
| Gate Mechanism: |
Safetran Mid 1970s
|
Siemens Imprinted |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
Pictures 1-22 and the 1st video were taken on April 2, 2021, by SETX Sirens
and Rail.
The 2nd video was taken on March 29, 2026, by SETX Sirens and Rail.
Pictures 23-29 were taken on June 14, 2026, by SETX Sirens and Rail.
This crossing is located on the UP Beaumont Subdivision.
Page created by SETX Sirens and Rail (using HopenRXRTools 1.0.3).
A return visit on June 14, 2026 finds that the southern signal has received a new gate mechanism and light and the northern signal has received new gate lights!