The 1st video was taken on August 4, 2023, by Owen The Railfan. The 2nd video was taken on October 8, 2023, by Owen The Railfan. The 3rd video was taken on December 31, 2023, by Owen The Railfan. The 4th video was taken on April 14, 2024, by Owen The Railfan.
Pictures 16-22 and the 5th video were taken on February 17, 2025, by Owen The Railfan.
Pictures 1-15, and 22 were taken on February 18, 2025, by Owen The Railfan.
This crossing is located on the NECR Palmer Subdivision.
Page created by Owen The Railfan (using HopenRXRTools 1.3.0).
Bridge St used to be the
route to Ninsdale, NH. The 2 bridges however have sinced been replaced
by a single bridge that takes a different route into Vermont. The
bridges plan to be used as pedestrians only. The Crossing will still
stay open for Amtraks New Train Station. You can see a contruction
vehicle plowing snow off the bridges even though its closed.