MP: 40.30

Updated January 2026

Total Accidents:  2
Crossing DOT #:  288911B
TOTAL DAILY TRAINS:  40   (AS OF 2016)

>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: Siemens E-Bell Low Tone None
Base: Safetran 5" Single Sided ^ Safetran 5" Single Sided ^
Lights: 6 - 12"x24" Safetran w/ GE Uniform Look LEDs 4 - 12"x24" Safetran w/ GE Uniform Look LEDs
Junction Boxes: Safetran Safetran
Gate Lights: 3 - 4" RECO LEDs 3 - 4" RECO LEDs
Gate Mechanism: Safetran 2000s w/ GSI Gate Saver Safetran 2000s w/ GSI Gate Saver
Gate Striping: Vertical Striping Vertical Striping

The 1st video was taken on January 23, 2015.
Pictures 1-25 were taken on January 24, 2015.
Pictures 26-28 were taken on February 19, 2016.
Pictures 29-32 were taken on December 20, 2018.
The 2nd video was taken on December 25, 2018.
The 3rd video was taken on April 28, 2020.
Picture 33 was taken on July 16, 2020.
The 4th video was taken on July 30, 2020.
The 5th video was taken on October 21, 2020.
The 6th video was taken on September 1, 2025.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the CN Chicago Sub.

1 2
Overview of 2 late IC gated signals facing east.
Overview facing west.
3 4 5
6 7 8 9
10 11 12 13
Th western signal. This had a 2nd Gen Safetran Mechanical Bell at the time.
14 15 16 17
18 19 20 21
The eastern signal.
22 23 24 25
The relay bungalow in the southeast quadrant.
The grade is all wood.
Track view facing north towards Harlem Ave.
Track view facing south towards Main St.
26 27 28
In February 2016, we see that blue DOT signs were added to the signals.  The eastern gate was also restriped.
29 30 31 32
In December 2018, we see the DOT signs were turned to face forward.
33
In July 2020, we see a PTC antenna was added to the bungalow.
34 35
In December 2021, we see the Safetran bell was replaced with a Siemens E-Bell. Unfortunately, the full size images somehow got deleted, so the thumbnails are all you'll get.