Pictures 1-25 and the 1st video were taken on September 21, 2016, by Tommy McGowan.
The 2nd video was taken on November 19, 2023, by Nicholas Miles/Northwestern Ohio Rail Productions.
The 3rd video was taken on October 10, 2024, by Nicholas Miles/Northwestern Ohio Rail Productions.
Pictures 26-36 were taken on October 15, 2025, by Nicholas Miles/Northwestern Ohio Rail Productions.
This crossing is located on the CSX Willard Sub.
1
2
Overview of 2 gated signals facing east.
Overview facing west.
3
4
5
6
7
8
9
10
11
The western signal.
12
13
14
15
16
17
18
19
20
21
The eastern signal.
22
23
24
25
The relay bungalow in the northwest quadrant.
The southern track's grade is rubber and asphalt and the northern track's is wood and asphalt.
NOVEMBER 2025 UPDATE: Sir Fluent here. Since Tommy was last out here, a few changes were made to the crossing.
26
27
28
29
30
31
32
33
34
35
36
In October 2025, Nicholas Miles discovered all the
lights were upgraded to LED, both crossbucks were replaced, the western
signal's gate arm was replaced, along with the eastern signals (with one
of the LEDs being NEG) and the grade was resurfaced. The DOT tags were
also moved up to be below the lights rather than below the gate
mechanism.