Pictures 1-25 and the 1st video were
taken on September 16, 2015, by Tommy McGowan.
Pictures 26-32 and the 2nd video were taken on September 5, 2017, by
Tommy McGowan.
The 3rd video was taken on November 13, 2023, by Nicholas
Miles/Northwestern Ohio Rail Productions.
The 4th video was taken on September 2, 2024, by Nicholas
Miles/Northwestern Ohio Rail Productions.
Pictures 33-44 were taken on October 15, 2025, by Nicholas
Miles/Northwestern Ohio Rail Productions.
This crossing is located on the CSX Willard Sub.
In September 2017,
we see the southern signal's crossbuck was replaced, the northern
signal's gate was replaced, both DOT signs were moved above the gate
mechanism, and the grade was resurfaced.
NOVEMBER 2025 UPDATE: Sir Fluent here. Since
Tommy was last out here, a few changes were made to the crossing.
33
34
35
36
37
38
39
40
41
42
43
44
In October 2025, Nicholas Miles
discovered all the lights were upgraded to LED, both gate arms were
replaced (with one on the southern signal now having 2 NEG LEDs and 1
RECO LED at the bottom), the crossbuck and track signs being replaced
on the southern signal and the gate was resurfaced.