Pictures 1-12 were taken on December 18, 2010.
Pictures 13-26 were taken on March 20, 2011.
Pictures 27-62 were taken on December 23, 2014.
Pictures 63-69 were taken on Febraury 20, 2016.
The 1st video was taken on January 30, 2016.
The 2nd video was taken on January 1, 2017.
The 3rd video was taken on February 11, 2017.
The 4th video was taken on December 18, 2017.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights on it as well.
1
2
Overview of 2 soon to be replaced crossbucks facing south.
Action
shots from a WB container train. It had both mid train and rear
DPU power, which is unusual on this line. I would've had a video too,
but my tripod fell over from the wind and shut the camera off and
didn't save the video.
63
64
65
66
67
68
In February 2016, we see blue DOT signs werer added, and the crossbucks and tracks signs were replaced.
Sometime in 2017, the GS Type 2 was replaced by a Type 3.