Pictures 1-12 were taken on August 22, 2010.
Pictures 13-17 were taken on September 5, 2010.
Pictures 18-35 were taken on December 18, 2010.
Pictures 36-67 and the 1st video were taken on December 23, 2014.
Pictures 68-74 and the 2nd video were taken on February 20, 2016.
The 3rd video was taken on April 9, 2019.
The 4th video was taken on April 24, 2020.
The 5th video was taken on July 14, 2020.
The 6th video was taken on May 1, 2021.
The 7th video was taken on May 23, 2021.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the BNSF Chillicothe Sub with UP having trackage rights on it as well.
1
2
3
4
5
6
7
8
9
10
11
12
These pictures from
August 22, 2010, show that these 2 crossbucks were about to be
replaced. Mounds of stone were laying off to the side, and new
wires were sticking out everywhere.
13
14
15
A return visit on
September 5 shows that the new base on the south side was installed,
however the north side was not yet installed.
16
17
The new signals were
sitting by the depot in Coal City. Oak St. can be seen in the
background of Picture 16. By September 12, the new signals were
in and operating.
In early 2011, the rear right light
background on the northern signal went missing. Later, a 20"
background appeared, and now it's back to a 24" background. Very
weird.
In late 2012, the telegraph poles along the tracks were removed.
In
February 2016, we see that blue DOT signs were added and both
crossbucks and track signs were replaced. Also, the front left
light on the southern signal is missing a visor. It was fixed shortly after.