Northern Signal |
Southern Signal |
| Bell: |
NEG E-Bell |
NEG E-Bell |
| Base: |
WCH 5" Double Sided ^ |
WCH 5" Double Sided ^ |
| Lights: |
4 - 12"x24" WCH w/ Leotek EV LEDs |
4 - 12"x24" WCH w/ Leotek EV LEDs |
| Junction Box: |
WCH w/ Bell Extension |
WCH w/ Bell Extension |
| Gate Lights: |
4" NEG LEDs |
4" NEG LEDs |
| Gate Mechanism: |
Siemens Imprinted w/ Old NEG 2 Way Saver |
Siemens Imprinted w/ Old NEG 2 Way Saver |
| Gate Striping: |
Vertical Striping |
Vertical Striping |
Pictures 1-10 were taken on December 8, 2014.
Pictures 11-14 were taken on November 23, 2015.
Pictures 15-40 were taken on July 24, 2020.
The 1st video was taken on November 11, 2020.
The 2nd video was taken on October 21, 2024.
All pictures and videos were taken by Tommy McGowan.
This crossing is located on the CSX New Rock with IAIS having trackage rights on it as well.
In May 2019, signals were finally
installed at this crossing. This was the last public passive
crossing on the New Rock Sub mainline.