![]() |
![]() |
![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
| >>>>>>>>>>>>>> | Northern Signal | Southern Signal |
| Bell: | WCH E-Bell | WCH E-Bell |
| Base: | WCH 5" Single Sided | WCH 5" Single Sided |
| Light Brackets: | WRRS | WRRS |
| Lights: | 4 - 12"x24" WCH w/ WCH/Miller 1st Gen LEDs | 4 - 12"x24" WCH w/ GE Pixelated Look LEDs |
| Gate Lights: | 3 - NEG Clear LEDs | 3 - NEG Clear LEDs |
| Gate Mechanism: | WCH Style 3.5 | WCH Style 3.5 |
| Gate Striping: | Vertical Striping | Vertical Striping |
| 1 |
2 |
| Overview facing north. | Overview facing south. |
| 3 |
4 |
5 |
| 6 |
7 |
8 |
| The northern signal. | ||
| 9 |
10 |
11 |
| 12 |
13 |
14 |
| The southern signal. | ||
| 15 |
16 |
17 |
18 |
| The relay bungalow in the northeast quadrant. | The grade is all concrete. | Track view facing east towards 680th Ave. | Track view facing west towards 650th Ave. #1 in Nevada. |
| 19 |
20 |
21 |
| 22 |
23 |
24 |
| The crossing in action! The new rails seen on pictures 17-18 on the side of the existing mainline were installed at some point in picture 19! The track date is now March 2023. This crossing was left constantly on. There were no trains in sight, and the crossing never deactivated in the time that I was here. Something very similar to this happened at S Ave. in Boone before those signals got removed. |
||