>>>>>>>>>>>>>>>
Western Signal North Track
Eastern Signal North Track
Western Signal South Track
Eastern Signal South Track
Bell:
GS Type 3 E-Bell
None
None
GS Type 2 E-Bell (Dead)
Base:
Safetran 5" Single Sided ^
Safetran 5" Single Sided ^
Safetran 5" Single Sided ^
Safetran 5" Single Sided ^
Lights:
4 - 12"x20" Hawker Safetran incandescents
4 - 12"x20" Hawker Safetran incandescents
4 - 12"x20" Hawker Safetran incandescents
4 - 12"x20" Hawker Safetran incandescents
Junction Box:
Safetran
Safetran
Safetran
Safetran
Gate Lights:
3 - RECO 4" LEDs
3 - RECO 4" LEDs
3 - RECO 4" incandescents
3 - RECO 4" incandescents
Gate Mechanism:
Safetran 1990s w/ Standard Mount
Safetran 1990s w/ Standard Mount
Safetran 1990s w/ Standard Mount
Safetran 1990s w/ Standard Mount
Gate Striping:
Vertical Striping
Vertical Striping
Vertical Striping
Vertical Striping
Pictures 1-47 were taken on August 7, 2017, by Tommy McGowan.
The 1st video was taken on August 14, 2024, by Nicholas Miles.
The 2nd video was taken on September 25, 2024, by Nicholas Miles.
Pictures 48-56 were taken on July 8, 2025, by Nicholas Miles.
Pictures 57-69 were taken on October 11, 2026, by Nicholas Miles.
This crossing is located on the NS Fostoria District.
This is a double track mainline, but both tracks are separated for some
reason, and both tracks have their own set of gated signals.
1
2
Overview of the north track's signals facing east.
Overview facing west.
The north track's western signal.
The north track's eastern signal.
21
22
23
24
The relay bungalow on the south side.
The north track's grade is rubber and asphalt.
Track view facing west towards Joslyn St.
Track view facing east at TR 257 .
25
26
Overview of the south track's signals facing east.
Overview facing west.
The south track's western signal.
The south track's eastern signal.
45
46
47
The south track's grade is rubber and asphalt.
Track view facing west towards Joslyn St.
Track view facing east at TR 257 .
48
49
In July 2025, Nicholas Miles discovered all 4 gates were replaced.
57
58
In October 2026, we see some minor changes.
62
63
64
The west track's signals had their gates replaced, likely with RECO LEDs, but is unconfirmed.
65
66
The western signal on the east track had its crossbuck replaced.
VIDEO
VIDEO