Last crossing on Caltrain with Mechanical bells *25th Ave

Post videos from railroad crossings here.

Moderators: freebrickproductions, mlgillson, PlyingKibbles89, Raco_GS, Hopen111, TommyBNSF

Post Reply
shota's railfan
kuchnie-na-wymiar.wroclaw.pl

Last crossing on Caltrain with Mechanical bells *25th Ave

Post by shota's railfan »




This crossing used to have 1 WCH Mechanical Bell,2 WCH E-Bell 1 Safetran M-Bell but 1 Safetran M-Bell is replaced to a WCH M-Bell but one WCH E-Bell is replaced to a GS Type 2 E-Bell

2018 they..
Removed a harrmon cantilever on other side
Kept the mechanical bells
Added a Median signal-somehow
Replaced a WCH E-Bell on the Pedestrian Crossing (Left side) with a General Signals Type-2 E-bell

This crossing plans to be grade separated in 2020 and the future for the overpass, rated the 5 most dangerous crossings. Due to traffic.
Location: East 25th Ave & S. Delaware St, San Mateo, CA
Caltrain owns this crossing
bells ring until gates rise
Post Reply