That was unexpected... I was expecting to see the 8" removed and replaced with 12"x24" frames. I wasn't expecting Safetran cantilevers, a Safetran type 3 e-bell and gates...
That's the CN Manitowoc Sub, the daily train count is pretty accurate, if anything a bit high.
IIRC there's a daily train to/from Manitowoc, and another that takes a secondary branch from Hilbert south to Kiel on alternate days...so some days it gets 4, other days only 2.
I am surprised by the Safetran Type 3 e-bell, which I didn't even notice until Mike pointed it out. CN has almost exclusively used GS Type 2 bells on their new/upgrade installations for a few years, even though they used other Safetran equipment like the cantilevers and frames for the Dialight L.E.D.s.